Performance Test
4
Keysight U3401A User’s and Service Guide
75
Performance Verification Tests Overview
Performance verification tests is an extensive set of tests that are recommended
as an acceptance test when you first receive the instrument.
Use the performance verification test to verify the measurement performance of
the instrument. The performance verification test uses the instrument’s
specifications listed in
Chapter 6, “Characteristics and Specifications”
.
Performance verification tests
The performance verification test is recommended as acceptance tests when you
first received the instrument. The acceptance test results should be compared
against the one-year test limits. After acceptance, you should repeat the
performance verification tests at every calibration interval.
If the instrument fails performance verification, adjustment or repair is required.
Contact your local Keysight Service Center for details.
This test checks the full-scale reading accuracy of the instrument.
DC Voltage Verification Test
1
Connect the calibrator to the front panel Hi and Lo input terminals.
2
Select each function and range in the order shown in
. Provide the
input shown in
3
Make a measurement and observe the result. Compare measurement results
to the appropriate test limits shown in the
. (Be certain to allow for
appropriate source settling when using the Fluke 5520A).
NOTE
on page 74 before doing the
performance verification tests.
Содержание U3401A
Страница 1: ...Keysight U3401A 4 1 2 Digit Dual Display Multimeter User s and Service Guide ...
Страница 12: ...12 Keysight U3401A User s and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 16: ...16 Keysight U3401A User s and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 70: ...3 Application Tutorial 70 Keysight U3401A User s and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 82: ...4 Performance Test 82 Keysight U3401A User s and Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...