Calibration Procedures
1
Keysight U1190A Series Service Guide
31
Performance Verification Tests
Use the performance verification tests to verify the measurement performance of
the instrument. The performance verification tests use the instrument's
specifications listed in the
U1190A Series User's Guide
(available for download at
www.keysight.com/find/hhTechLib
).
The performance verification tests are recommended as acceptance tests when
you first receive the instrument. The acceptance test results should be compared
against the one-year test limits. After acceptance, you should repeat the
performance verification tests at every calibration interval.
If the clamp meter fails the performance verification tests, adjustment or repair is
required.
NOTE
Ensure that you have read the
on page 24 before running
the performance verification tests.
Table 1-5
Performance verification tests
Step Test function
Range
Fluke 5520
output
Reference
values
Error from nominal 1 year
U1191A
U1192A
U1193A
U1194A
1
ACA
Turn the
rotary switch to the
position.
60 A
1.2 A, 45 Hz
60 A, 45 Hz
-
±1.25 A
±1.25 A
±1.25 A
1.2 A, 400 Hz
60 A, 400 Hz
-
±1.85 A
±1.85 A
±1.85 A
400 A
8 A, 45 Hz
400 A, 45 Hz
±8.5 A
±8.5 A
-
-
8 A, 400 Hz
400 A, 400 Hz
±12.5 A
±12.5 A
-
-
600 A
12 A, 45 Hz
600 A, 45 Hz
-
-
±12.5 A
±12.5 A
12 A, 100 Hz
600 A, 100 Hz
-
-
±18.5 A
±18.5 A
2
DCA
Turn the
rotary switch to the
position,
and press the
key
until is shown on the
display.
60 A
1.2 A
60 A
-
-
-
±1.25 A
600 A
12 A
600 A
-
-
-
±12.5 A
Содержание U1190A Series
Страница 1: ...Keysight U1190A Series Handheld Clamp Meter Service Guide ...
Страница 10: ...10 Keysight U1190A Series Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 14: ...14 Keysight U1190A Series Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...
Страница 16: ...16 Keysight U1190A Series Service Guide THIS PAGE HAS BEEN INTENTIONALLY LEFT BLANK ...