Tests, Adjustments, and Troubleshooting
Preliminary Checks

Preliminary Checks

Preliminary checks include the following:

The Operator’s Check

The Operator’s Check tests the basic functionality of the source, switches, 

and receivers in the network analyzer.
The performance of the network analyzer is specified in two ways: system 

specifications and instrument specifications. It is the end user’s 

responsibility to determine which set of specifications is applicable to their 

use of the network analyzer. This section includes system verification. If 

instrument specifications verification is required, contact Keysight. Refer to 

https://www.keysight.com/find/usb-vna

.

A network analyzer measurement “system” includes the network analyzer, 

calibration kit, test cables, and any necessary adapters. The system 

verification software is used to verify the system’s conformance to the 

“system” specifications. A “pass” result demonstrates that the network 

analyzer test cables and adapters perform correctly as a system. It DOES 

NOT demonstrate that any one component performs according to its 

individual specifications. A change to any part of this measurement system 

requires a re-verification of the system.

The Operator’s Check

The Operator’s Check is a software driven test that checks the basic operation 

of the assemblies in all of the measurement port signal paths. By performing 

the Operator’s Check, the following are determined:

— attenuation ranges of all internal attenuators
— calibration of the receivers
— frequency response of the receivers
— phase  lock
— noise  floor  and  trace  noise
— various  voltages  throughout the network analyzer

Allow the network analyzer to warm up for at least 15 minutes before 

performing the Operator’s Check.

Содержание P937 A Series

Страница 1: ...e Keysight P937xA Streamline Series USB Vector Network Analyzers P9370A 300 kHz to 4 GHz P9371A 300 kHz to 6 5 GHz P9372A 300 kHz to 9 GHz P9373A 300 kHz to 14 GHz P9374A 300 kHz to 20 GHz P9375A 300 kHz to26 5GHz ...

Страница 2: ...overnment customers under its standard commercial license which is embodied in its End User License Agreement EULA a copy of which can be found at http www keysight com find sweula The license set forth in the EULA represents the exclusive authority by which the U S government may use modify distribute or disclose the Software The EULA and the license set forth therein does not require or permit a...

Страница 3: ...ing URL http www keysight com find emailupdates Information on preventing analyzer damage can be found at http www keysight com find tips Safety and regulatory information can be found in the Startup Guide available online at http literature cdn keysight com litweb pdf P9370 90001 pdf Is your product software up to date Periodically Keysight releases software updates to fix known defects and incor...

Страница 4: ...4 ...

Страница 5: ...ditions Operating 20 2 General Product Information Information in This Chapter 19 Maintenance 20 Analyzer Options Accessories and Upgrades Available 21 Keysight Support Services and Assistance 22 Service and Support Options 22 Contacting Keysight 22 Shipping Your Network Analyzer for Service or Repair 22 3 Tests Adjustments and Troubleshooting Information in This Chapter 25 Before You Begin 27 Get...

Страница 6: ...formance Tests 45 Guidelines for Ordering Power Sensor Calibration Service 46 Adjustments 48 10 MHz Frequency Reference Adjustment 48 Source Adjustment 49 Receiver Adjustment 50 Troubleshooting 51 Check the Basics 51 4 Replaceable Parts Listings Information in This Chapter 53 Ordering Information 54 Assembly Replacement Procedure 55 Replaceable Parts Listings 56 Entire Analyzer 56 Miscellaneous Pa...

Страница 7: ...1 Post Repair Procedures 73 Ingot Chassis Utilities 74 6 General Product Information Information in This Chapter 87 Error Terms 88 Using Error Terms as a Diagnostic Tool 88 Performing Measurement Calibration 89 Using Flowgraphs to Identify Error Terms 89 Manual Access to Error Terms 90 91 Error Term Data 92 Accessing the Keysight License Manager KLM and Installing Your License Files 95 Firmware Up...

Страница 8: ...8 Keysight P937xA PXIe Service Guide Contents ...

Страница 9: ... agencies Section Title Summary of Content Start Page Safety Symbols Descriptions of CAUTION and WARNING symbols used throughout this manual page 10 General Safety Considerations A list of safety points to consider when servicing your network analyzer page 11 Electrostatic Discharge Protection A discussion of electrostatic discharge ESD and related recommendations and requirements for ESD protecti...

Страница 10: ...azard It calls attention to a procedure that if not correctly performed or adhered to would result in damage to or destruction of the product Do not proceed beyond a caution note until the indicated conditions are fully understood and met Denotes a hazard It calls attention to a procedure which if not correctly performed or adhered to could result in injury or loss of life Do not proceed beyond a ...

Страница 11: ... by not using the correct components may cause product damage and serious injury These servicing instructions are for use by qualified personnel only To avoid electrical shock do not perform any servicing unless you are qualified to do so Operator is responsible for maintaining safe operating conditions To ensure safe operating conditions P937xAs should not be operated beyond the full temperature ...

Страница 12: ... used together provide a significant level of ESD protection Of the two only the table mat and wrist strap combination provides adequate ESD protection when used alone To ensure user safety the static safe accessories must provide at least 1 meg ohm of isolation from ground Figure 1 1 ESD protection setup Unpack the P937xA network analyzer from the shipping containers Keep the black plastic port p...

Страница 13: ...harge Protection Inspect for Damage After unpacking a network analyzer inspect it for any shipping damage Report any damage to the shipping agent immediately as such damage is not covered by the warranty To avoid damage when handling the network analyzers do not touch exposed connector pins ...

Страница 14: ... a safe condition The documentation contains information and warnings that must be followed by the user to ensure safe operation and to maintain the product in a safe condition EMC Complies with the essential requirements of the European EMC Directive as well as current editions of the following standards dates and editions are cited in the Declaration of Conformity IEC EN 61326 1 CISPR Pub 11 Gro...

Страница 15: ...gulatory Information Safety Acoustic statement European Machinery Directive Acoustic noise emission LpA 70 dB Operator position Normal operation mode per ISO 7779 Complies with the following standard dates and editions are cited in the Declaration of Conformity IEC EN 61010 1 ...

Страница 16: ...necessary for the user to refer to the instructions in the documentation This symbol indicates separate collection for electrical and electronic equipment mandated under EU law as of August 13 2005 All electric and electronic equipment are required to be separated from normal waste for disposal Reference WEEE Directive 2002 96 EC This symbol is used to identify a terminal which is internally conne...

Страница 17: ...tisfies the requirements for the China standard GB 18455 2001 as required by the China RoHS regulations for paper fiberboard packaging South Korean Certification KC mark includes the marking s identifier code which follows this format MSIP REM Kst ZZZZZZZZZZZZZZ USB connectors Kensington security Lock For safety reasons only equipment Keysight approved accessories should be used with the instrumen...

Страница 18: ... power to the AC DC adapter The front panel switch is only for the DC power within the instrument and not for the AC DC adapter Alternately an AC switch or circuit breaker which is readily identifiable and is easily reached by the operator may be installed and used as a disconnecting device to remove mains power from the AC DC adapter The AC DC adapter has an auto ranging line voltage input be sur...

Страница 19: ...ily reached by the operator The detachable power cord is the instrument disconnecting device It disconnects the mains circuits from the mains supply before other parts of the instrument The front panel switch is only a standby switch and is not a LINE switch Alternatively an externally installed switch or circuit breaker which is readily identifiable and is easily reached by the operator may be us...

Страница 20: ...pply voltage fluctuations up to 10 of the nominal voltage Environmental Conditions Operating The instruments can operate with mains supply voltage fluctuations up to 10 of the nominal voltage Instrument DC input 15 to 24 VDC External AC power adapter Efficiency Level VI Input 100 to 240 VAC 50 to 60 Hz 1 5 A to 0 75 A Output 15 VDC 5 6A max 90W max 40 C linearly derate to 45W at 55 C Power consump...

Страница 21: ...ctrical maintenance of your analyzer page 20 Analyzer Options Accessories and Upgrades Available A hyperlink to the network analyzer Configuration Guide which includes a list of options accessories and upgrades available for the network analyzer page 21 Keysight Support Services and Assistance The Internet address URL for Keysight assistance Service and support options available Calibration option...

Страница 22: ... from the external case of the network analyzer P937xA clean the case using a dry or slightly dampened cloth only To prevent electrical shock remove analyzer module from chassis slot for cleaning Use a dry cloth or one slightly dampened with water to clean the external case parts Do not attempt to clean internally ...

Страница 23: ...ons Accessories and Upgrades Available To see a list of the options accessories and upgrades available for the network analyzers including ordering information refer to the Keysight PNA Family Microwave Network Analyzers Configuration Guide available online at https literature cdn keysight com litweb pdf 5992 2823EN pdf id 29746 38 ...

Страница 24: ...service follow the steps below 1 Review the warranty information shipped with your product 2 Contact Keysight to obtain a Return Material Authorization RMA and return address For assistance finding Keysight contact information go to www keysight com find assist worldwide contact information for repair and service 3 Write the following information on a tag and attach it to the network analyzer 4 Na...

Страница 25: ...e The serial number can also be read from the Soft Front Panel SFP interface after the hardware is installed 6 Description of the failure or service required 7 On the shipping label write ATTENTION REPAIR DEPARTMENT and the RMA number 8 Ship the analyzer module using the original packaging materials Shipping the analyzer module in anything other than the original packaging may result in non warran...

Страница 26: ...24 Keysight P937xA PXIe Service Guide General Product Information Keysight Support Services and Assistance 2 ...

Страница 27: ...ause of a failure Section Title Summary of Content Start Page Before You Begin Items to consider or procedures to perform before testing is begun Verify the Operating Environment Protect Against Electrostatic Discharge Allow the Analyzer to Warm Up Review the Principles of Connector Care page 27 About System Verification and Performance Tests Descriptions of System Specifications Instrument Specif...

Страница 28: ...checks before performing system verification page 33 System Verification What the system verification does How to perform the verification test How to interpret the results page 36 Test Management Environment TME Performance Tests A list of equipment needed and TME webpage link information page 45 Troubleshooting A list of troubleshooting suggestions page 51 Section Title Summary of Content Start ...

Страница 29: ...s to the network analyzer depends on the type of controller you use Because the P937xA uses a remote controller you need a GPIB card for the PC Verify the Operating Environment For Operating Environment information refer to the online Data Sheet at http literature cdn keysight com litweb 5992 2765EN pdf Protect Against Electrostatic Discharge ESD For information on protecting against electrostatic...

Страница 30: ...ts are used to verify the module s conformance to instrument specifications Refer to Test Management Environment TME Performance Tests on page 45 System Specifications System specifications specify warranted performance of the measurement system when making error corrected measurements using the same calibration kit and test cables used during the system verifications routine System specifications...

Страница 31: ...t has a traceable path to NIST The total measurement uncertainty limits for the performance verification are the sum of the factory measurement uncertainties and the uncertainties associated with measuring the same devices on the system being verified The difference between the factory measured data and the verification measured data must fall within the total uncertainty limits at all frequencies...

Страница 32: ...m specifications If the performance tests are used to confirm instrument specifications the certificate of calibration will apply to the network analyzer as an independent instrument The equipment and measurement standards used for the tests must be certified and must be traceable to recognized standards If you have a measurement application that does not use all of the measurement capabilities of...

Страница 33: ...out stopping to repair or adjust 1 Refer to Figure 3 1 for test flow Print data at the completion of all the tests even if you are aware that the network analyzer did not pass If there is a failure complete the verification before you troubleshoot repair and adjust After the failure has been corrected repeat the entire set of performance tests and generate a new set of data Figure 3 1 ANSI NCSL Z5...

Страница 34: ...compliant verification perform the preliminary checks and the performance tests while stopping to troubleshoot Refer to Figure 3 2 for test flow Troubleshoot and repair the first problem encountered without continuing to other tests After you troubleshoot repair and adjust repeat the last failed portion and generate a new set of data Figure 3 2 Non Standards Compliant Verification Flowchart ...

Страница 35: ... kit test cables and any necessary adapters The system verification software is used to verify the system s conformance to the system specifications A pass result demonstrates that the network analyzer test cables and adapters perform correctly as a system It DOES NOT demonstrate that any one component performs according to its individual specifications A change to any part of this measurement sys...

Страница 36: ...en to pause at each step in the process to allow moving the short open to the appropriate port or Shorts Opens are attached to ALL ports to run through the test without stopping Shorts and opens can be mixed on the test ports In most cases the short open is not required since the analyzer test port s female connector acts an open However if the test fails confirm the failure with a short open atta...

Страница 37: ...igure 3 3 Operator s Check Dialog Boxes If the Operator s Check Fails 1 Clean the test ports and the open s or short s and torque to specification Repeat the check 2 If the check still fails return the network analyzer to Keysight See Shipping Your Network Analyzer for Service or Repair on page 22 ...

Страница 38: ...cedure verifies proper operation of the network analyzer calibration kit test port cables together as a system It DOES NOT verify that any of these components pass their specifications independently The user is responsible for independently calibrating and verifying the proper operation of the calibration kit and test port cables prior to performing the system verification Measurement Uncertainty ...

Страница 39: ...ice response When the phase of an error response is not known phase is assumed to be worst case 180 to 180 Random errors such as noise and connector repeatability are generally combined in a root sum of the squares RSS manner Measurement Traceability To establish a measurement traceability path to a national standard for a network analyzer system the overall system performance is verified through ...

Страница 40: ... by the network analyzer firmware The process for the verification is connect cables to the analyzer test ports perform a calibration or recall a recent calibration run the system verification program for the verification devices Each time through the verification process you are prompted to make necessary connections and perform or recall a calibration as part of performing the verification If yo...

Страница 41: ...n the cable tests earlier in this chapter that show the performance of good cables It is highly recommended that the test port cables be regularly tested If the system verification is performed with a non Keysight cable ensure that the cable meets or exceeds the specifications for the test cable specified in Table 3 1 Refer to the cable s user s guide for specifications Kit Substitution Non Keysig...

Страница 42: ...fication The System Verification dialog box is displayed as shown in Figure 3 5 Figure 3 5 System Verification Dialog Box 5 In the Select Calibration Kit box click on the calibration kit or electronic calibration module ECal being used The corresponding verification kit to use is selected for you and displayed in the Compatible Verification Kit s box 6 Under Outputs click one of the following opti...

Страница 43: ...rification Test 1 Disconnect and clean the device that failed the verification test 2 Reconnect the device making sure that all connections are torqued to the proper specifications 3 Measure the device again 4 If the analyzer still fails the test check the measurement calibration by viewing the description of the error terms For more information refer to the TME webpage at http cal software keysig...

Страница 44: ... 7 shows an example of typical verification results with Print Tabular Data selected in the Output area of the System Verification dialog box At the top of the printed output is the name of the device the serial number of the device and the date tested Each S parameter measurement result is printed with frequency tested lower and upper limit lines the measured data and the result of the test ...

Страница 45: ...ted in the Output area of the System Verification dialog box The printed graphical results show the following the name of the device measured the serial number of the device the parameters measured Results of the measurements Labeled as A in Figure 3 8 Data measured at the factory from the verification kit Labeled as B in Figure 3 8 Upper and lower limit points as defined by the total system uncer...

Страница 46: ...44 Keysight P937xA PXIe Service Guide Tests Adjustments and Troubleshooting System Verification 3 Figure 3 8 Example of Printed Graphical Verification Results ...

Страница 47: ...unless otherwise specified Refer to each individual test for specific setup configurations The computer and all test equipment are connected to the unit under test UUT using GPIB and PXI Requires a PC controller to run the TME Performance Tests Table 3 2 Required Test Equipment TME Performance Testing Test Equipment Recommended Model Alternate Model PNA network analyzer N5245A N5222A N5224A N5225A...

Страница 48: ...he loads are used 85052D ECal module 3 5 mm N4691 60004 order as N4691B Option M0F N4691 60008 Cables RF 3 5 mm m to 3 5 mm f 3 required 8121 2111 Adapters 3 5 mm f to 3 5 mm f 85059B 1250 1749 3 5 mm m to 2 4 mm m 2 required 11904A 3 5 mm m to Type N m 1250 1743 BNC m to Type N f 1250 1477 3 5 mm m to 3 5 mm m 2 required 83059A 1250 1748 a N1914A power meters with serial number prior to MY5304000...

Страница 49: ...oids manual entry The overall resulting N7800A measurement uncertainties then reflects these lower device uncertainties The equipment requirements of each N7800A calibration application are summarized in the specials calibration matrix which can be found at the Recommended Lab Standards and Special Cal Options website 5 The Keysight Option H99 is a special option for the Roseville Service Center o...

Страница 50: ...ipment Used for the 10 MHz Frequency Reference Adjustment Procedure 1 Make the proper connections for your USB equipment 2 Press Utility System Service Adjustments 3 In the Select Desired Adjustment dialog box click 10 MHz Freq Adjustment 4 Follow the instructions and prompts as they are displayed Ensure the GPIB settings are correct if using the automated mode of operation Equipment Type Model or...

Страница 51: ...adapter to the analyzer Port 1 If using a power meter make the proper GPIB connections Refer to Get the Hardware Required for your GPIB Instruments on page 27 2 Press Utility System Service Adjustments 3 In the Select Desired Adjustment dialog box click Source Adjustment 4 Follow the instructions and prompts as they are displayed If using a power meter ensure the GPIB settings for the sensor s are...

Страница 52: ...asurements Data can be recreated by performing another receiver calibration adjustment Equipment Used for the Receiver Adjustment Procedure 1 Connect the USB power sensor and adapter to the analyzer Port 1 If using a power meter make the proper GPIB connections Refer to Get the Hardware Required for your GPIB Instruments on page 27 2 Press Utility System Service Adjustments 3 In the Select Desired...

Страница 53: ...ut no firmware is in control GREEN Firmware is in control analyzer is probably idle FLASHING GREEN A sweep or measurement has been triggered 4 If the chassis has power applied but the power switch LED is not on and the fans are not turning then suspect this is due to a defective power switch Consider changing the power switch by refer to Front Panel Replacement Procedure on page 65 If the problem ...

Страница 54: ...dn keysight com litweb pdf 5992 2765EN pdf for analyzer specifications 9 With a soft failure the network analyzer s performance has degraded to an unacceptable level yet it continues to operate and display no error messages For this type of failure TME performance tests must be conducted to isolate the problem If the network analyzer fails the TME performance tests but pass the operator s check th...

Страница 55: ... you in identifying the correct part for your analyzer contains ordering information for new assemblies Section Title Summary of Content Start Page Ordering Information How to order a replaceable part from Keysight Technologies page 54 Assembly Replacement Procedure The correct sequence for determining the failure of and replacing a defective assembly page 55 Replaceable Parts Listings Tables with...

Страница 56: ... Technologies for instructions on where to send the order Refer to Contacting Keysight on page 2 22 To order a part that is not listed in the replaceable parts lists include the instrument model number and complete instrument serial number include the description and function of the part indicate the quantity required Contact Keysight Technologies for instructions on where to send the order Refer ...

Страница 57: ... Troubleshooting Follow up with the appropriate troubleshooting chapter that identifies the faulty assembly Step 2 Order a replacement assembly Refer to this chapter for part numbers and ordering information Step 3 Replace the faulty assembly and determine what adjustments and performance tests are necessary Refer to Chapter 5 Removal and Replacement Procedures Step 4 Perform the The Operator s Ch...

Страница 58: ...s Listings Entire Analyzer Figure 4 1 Overview of P937xA USB VNA Descriptions and part numbers for the assemblies and parts shown in the above illustration can be found at the following Table 4 1 Miscellaneous parts and accessories not illustrated in Figure 4 2 are listed under Miscellaneous Parts on page 4 58 ...

Страница 59: ... Chassis replacement A2 P9370 65701 1 P937xA Module replacement A3 P9375 60006 1 Front panel assembly include the on off keypad and the power switch board A4 P9375 40003 2 Front handle A5 P9375 40011 1 Front impact cover Not Shown P9370 80002 1 P937xA nameplate kits a If you are replacing a new chassis you must also purchase the P9370 80002 nameplate kits which include all the models nameplate lab...

Страница 60: ...58 Keysight P937xA PXIe Service Guide Replaceable Parts Listings Replaceable Parts Listings 4 Miscellaneous Parts Figure 4 2 P937xA USB VNA Miscellaneous Parts ...

Страница 61: ...Flathead Screw 2 0515 0664 4 M3 x 12 mm Screw 3a 3050 2529 5 Flat Washer 3b 2190 0124 5 Lock Washer 3c 2950 0078 5 Nut 4 1250 4261 2 SMA Load for LO IN and LO OUT Not Shown P9375 20006 1 Light pipe Not Shown 5188 5406 2 Port 1 and Port 2 Dust Cap Not Shown 1401 0431 5 SMB Connectors Dust Cap Description Part Number USB 3 0 cable P9375 60010 External Power Supply Desktop adapter 90 264 AC 15 VDC 6 ...

Страница 62: ...60 Keysight P937xA PXIe Service Guide Replaceable Parts Listings Replaceable Parts Listings 4 ...

Страница 63: ...e Electrostatic Discharge ESD Protection Information pertaining to ESD protection page 62 Connector Replacement Procedure A procedure for replacing the Streamline connectors page 63 Front Panel Replacement Procedure Procedure for replacing the front panel page 65 Chassis Replacement Procedure Procedure for replacing the USB VNA chassis page 68 Module Replacement Procedure Procedure for replacing t...

Страница 64: ...static discharge ESD Perform the following procedures only at a static safe workstation and wear a grounded wrist strap This is important If not properly protected against electrostatic discharge can seriously damage your analyzer resulting in costly repair To reduce the chance of electrostatic discharge follow all of the recommendations outlined in Electrostatic Discharge Protection on page 12 fo...

Страница 65: ...face 2 Place the spark plug adapter on the nut of the connector you are going to replace The adapter must fit snugly into the slots of the nut Refer to Figure 5 2 on page 64 Figure 5 1 Tools and Parts Description Keysight Part Number ESD grounding wrist strap 9300 1367 5 ft grounding cord for wrist strap 9300 0980 2 x 4 ft conductive table mat and 15 ft grounding wire 9300 0797 ESD heel strap for ...

Страница 66: ...ith the slots facing outward 2 Perform the Op Check to verify the new connectors are functional Refer to The Operator s Check on page 33 If it fails perform the Adjustments refer to Adjustments on page 48 then repeat the Op Check 3 For complete assurance that the connectors are meeting all criteria perform the following TME Performance Tests Refer to the TME webpage at http cal software keysight c...

Страница 67: ...uts follow by lock washer and flat washer item 3c 3b and 3a from the SMB connector 4 With a T 10 TORX driver remove the front handles item 2 by loosening the screws on both ends until the handle is free of the analyzer 5 Remove the flashhead screw item 1 from the front panel with T 8 TORX driver 6 Slide the front panel over the test port connectors 7 Disconnect the ribbon cable from the front pane...

Страница 68: ...66 Keysight P937xA PXIe Service Guide Removal and Replacement Procedures Front Panel Replacement Procedure 5 Figure 5 4 Removing and replacing A3 Front Panel Assembly ...

Страница 69: ...Keysight P937xA PXIe Service Guide 67 Removal and Replacement Procedures Front Panel Replacement Procedure Figure 5 5 Light Pipe Assembly ...

Страница 70: ...ord 2 Turn the instrument over so the bottom feet are facing up 3 Remove 0515 1227 x4 screws and old secondary plate P9375 00007 Save screws and plate for reuse Refer to Figure 5 7 4 Remove the front panel Refer to Removing and Replacing the A3 Front Panel Assembly on page 65 5 Remove the light pipe from the module Refer to the Figure 5 5 on page 67 6 Slide the A2 module out from the chassis Each ...

Страница 71: ...eplate overlay into the pocket shown below Figure 5 6 on page 69 There should also be a nameplate overlay included with the kit that matches your analyzer Rub down the overlay with moderate finger pressure 4 Attach the secondary plate P9375 00007 using 0515 1227 x4 screws to the new chassis 5 Perform the post repair steps verifications and performance tests that pertain to this removal procedure R...

Страница 72: ...70 Keysight P937xA PXIe Service Guide Removal and Replacement Procedures Chassis Replacement Procedure 5 Figure 5 7 Secure Regulatory Plate P9375 00007 0515 1227 x4 ...

Страница 73: ...rn the instrument over so the bottom feet are facing up 3 Remove 0515 1227 x4 screws and old secondary plate P9375 00007 Save screws and plate for reuse 4 Remove the front panel Refer to Removing and Replacing the A3 Front Panel Assembly on page 65 5 Remove the light pipe from the module Refer to the Figure 5 5 on page 67 6 Slide the A2 module out from the chassis Recording the new module serial n...

Страница 74: ... of the removal procedure 2 Remember to place the light pipe back into the module 3 Perform the post repair steps verifications and performance tests that pertain to this removal procedure Refer to Post Repair Procedures on page 73 When slide in the module make sure the PCB board sitting in between the groove on the both side Refer figure below ...

Страница 75: ...ce Procedures Replaced Assembly Adjustment etc TME Tests or Other Procedures A1 Ingot Chassis No adjustment needed Perform the OF Ingot Utilities Operator s check All TME based tests that apply A2 Module Assembly No adjustment needed Perform the OF Ingot Utilities Operator s check All TME based tests that apply A3 Front Panel Assembly No adjustment needed Operator s check Connector No adjustment n...

Страница 76: ...Step 1 Once the P937XA has been re assembled power up the USB VNA Step 2 Connect the chassis to the System Controller PC via USB cable a Consult the user guide P9370 90001 for the minimum requirements of the system controller Step 3 Download and install the OF Ingot Utilities Step 4 Run the OF Ingot Utilities Step 5 When OF Ingot Utilities opens the main menu with look like the image below a Make ...

Страница 77: ...Keysight P937xA PXIe Service Guide 75 Removal and Replacement Procedures Post Repair Procedures b If the chassis does not show press the Refresh button ...

Страница 78: ... Removal and Replacement Procedures Post Repair Procedures 5 Step 6 Locate the Chassis configuration file area of the menu at the bottom and press the Open button Step 7 In the Open Dialog box locate the directory Instruments and select it ...

Страница 79: ...XIe Service Guide 77 Removal and Replacement Procedures Post Repair Procedures Step 8 Select the directory for the product number you are working on Step 9 The file name will now appear in the Chassis configuration file ...

Страница 80: ...78 Keysight P937xA PXIe Service Guide Removal and Replacement Procedures Post Repair Procedures 5 Step 10 Press the Load button to load the Chassis configuration file ...

Страница 81: ...Keysight P937xA PXIe Service Guide 79 Removal and Replacement Procedures Post Repair Procedures Step 11 Select the Chassis Configuration Tab ...

Страница 82: ... both the model number P937XA and serial number MY USXXXXXXXX can be found on the Chassis regulatory plate from the original unit 1 Model Number Model number of the USB VNA b Serial Number Serial number of the USB VNA Figure 5 8 Regulatory Plate on Chassis This step is only required if you are replacing the chassis If you are replacing only the module skip this step and continue to the next step ...

Страница 83: ... Procedures Post Repair Procedures Step 13 Keying the slot configuration model number and manufacturing number a Model number Model number of the USB VNA b Manufacturing Number Manufacturing number off of the label on the PXI module Refer to Figure 5 7 on page 70 ...

Страница 84: ...82 Keysight P937xA PXIe Service Guide Removal and Replacement Procedures Post Repair Procedures 5 Example of all the fields filled in as below ...

Страница 85: ...he USB VNA and unplugged the power cord Wait for a few second before power up again The PC should able to identify the USB VNA at the right bottom of the PC screen Step 17 Install back the Multiple License Files This step is only required if you are replacing the chassis If you are replacing only the module skip this step All of the licenses in your UBS VNA need to be re host to the new hostID Con...

Страница 86: ...oolbar click Help then click About Network Analyzer Refer to Figure 5 9 Figure 5 9 About Network Analyzer Window Step 18 Perform Operator s Check and Calibration Operator s Check Perform the Operator s Check to check the basic functionality of the analyzer For instructions refer to the Chapter 3 Tests Adjustments and Troubleshooting of the Service Guide If you experience difficulty with the basic ...

Страница 87: ...ctions its performance relative to its specifications has not been verified It is recommended that a full instrument calibration be performed using the TME Performance Tests Refer to the TME webpage at http cal software keysight com If any of the tests fail perform the Adjustments refer to Adjustments on page 48 then repeat the tests ...

Страница 88: ...86 Keysight P937xA PXIe Service Guide Removal and Replacement Procedures Post Repair Procedures 5 ...

Страница 89: ... Chapter Section Title Summary of Content Start Page Error Terms How to use error term data as a diagnostic tool page 88 Accessing the Keysight License Manager KLM and Installing Your License Files How to use Keysight License Manager KLM to install your licenses on your instrument page 95 Firmware Upgrades How to get firmware upgrades page 98 ...

Страница 90: ...pna connectorcare Connector_Care htm or to the calibration kit s user s and service manual Preventive Maintenance If you print or plot the error terms at set intervals weekly monthly etc you can compare current error terms to these records A stable system should generate repeatable error terms over long intervals for example six months Look for the following A long term trend often reflects drift ...

Страница 91: ...Figure 6 1 and Figure 6 2 illustrate the error terms associated with measurement calibration for 1 port and 2 port configurations respectively Figure 6 1 Flowgraph of 1 Port Error Terms for Port 1 Where E Error term Subscript D Directivity S Source Match R Reflection Tracking The error terms are the same for a 1 port measurement on Port 2 S22 Follow ESD safe practices when working with the network...

Страница 92: ... Source Match R Reflection Tracking X Crosstalk Isolation L Load Match T Transmission Tracking 2nd Subscript F Forward measurement Port 1 to Port 2 R Reverse measurement Port 2 to Port 1 Manual Access to Error Terms Soft Front Panel Access to Error Terms Ensure the calibration correction is active by making sure that the check box for Correction on OFF has been selected ...

Страница 93: ... Standards to view the raw measurement data of the Standard ONLY available with Unguided Cal not ECal or Guided Cal or click Error Terms to view the corrected error term data 4 Use the Error Term box drop down list to select an error term or standard to view 5 Select the Enable check box to view the data on the PC display 6 Compare the displayed measurement trace to the equivalent data that starts...

Страница 94: ...System Verification on page 36 Data are listed here as a convenience only Detailed instrument specifications are in the Data Sheet viewable online at http literature cdn keysight com litweb 5992 2765EN pdf Table 6 1 Error Term Data1 Frequency Range Directivity Source match Load match Crosstalk2 300 kHz to 2 MHz 9 9 9 97 2 MHz to 1 GHz 21 19 21 95 1 to 2 GHz 21 20 19 123 2 to 4 GHz 21 20 15 121 4 t...

Страница 95: ...the driven port They are obtained by measuring the reflection S11 S22 of an open and a short that are connected directly to the ports Source match is a measure of the match of the coupler as well as the match between all components from the source to the output port The measurement most affected by source match errors are reflection and transmission measurements of highly reflective DUTs Typical C...

Страница 96: ...endently verified the analyzer requires repair Refer to Shipping Your Network Analyzer for Service or Repair on page 22 Transmission Tracking ETF and ETR Transmission tracking is the difference between the frequency response of the reference path including the R input and the frequency response of the transmission test path including the A or B input while measuring transmission The response of th...

Страница 97: ...After verifying the cable and its connections the analyzer requires repair Refer to Shipping Your Network Analyzer for Service or Repair on page 22 Accessing the Keysight License Manager KLM and Installing Your License Files To start KLM 1 On the PC controller In Windows 10 click the Search Windows icon 2 In the Search Windows box that opens type Keysight License Manager and when the Keysight Lice...

Страница 98: ...ure 6 4 Keysight License Manager Wrench icon and Install License File 6 In the Select License File s to Install on window that opens direct the path to the USB stick with your license files Refer to Figure 6 5 7 Click on the license key file lic Open Figure 6 5 Select License File s to Install Window 8 The Select License File s window closes and the Keysight License Manager window should now displ...

Страница 99: ...acting Keysight on page 22 9 Shut down the instrument application and restart Optional Cycle power on the instrument to activate the newly installed option upgrade s Press the power button once to power down the instrument 10 Disconnect the USB flash drive from the instrument Attempting to re install a license file that is already installed may generate a Corrupt Media error message Ignore this me...

Страница 100: ...es How to Check the Current Firmware Version 1 With the Network Analyzer application running click Help About Network Analyzer A dialog box showing the current installed Application Code Version is displayed 2 To determine if a firmware update is available proceed to https www keysight com find usb vna ...

Страница 101: ...ards compliant verification 3 32 O operating environment verify 3 27 Operator s Check 3 33 P performance tests about 3 28 3 29 3 45 physical maintenance 2 20 R receiver adjustment 3 50 reflection tracking error terms 1 94 repair connector 5 63 S service and support options 2 22 shipping your network analyzer for service or repair 2 22 source adjustment 3 49 source match error terms 1 93 specificat...