1-2
N67xx DUT Power Supply Installation
Overview
The DUT power supplies are installed in the rack(s) behind the i3070 Series 6
testhead.
shows the location of DUT power supplies in a 4-module system (rear
view, service position). A 2-module system contains only Bank 2 and one rack for
the DUT power supplies. The same installation instructions apply.
Figure 1-1
DUT power supplies in 4-module system
Install the DUT power supplies in the outer slot first, followed by the middle slot and
lastly the inner slot.
Figure 1-2
Assembly sequence of DUT power supplies
DUT power supplies
testhead
Bank 1
Bank 2
Above Bank 2
Module 3 Channel 1–4
Module 1 Channel 1–4
Module 3 Channel 1–4
Module 2 Channel 1–4
Mod 2
Channel 5–6
Mod 3
Module 0 Channel 1–4
Mod 2
Channel 5–6
Mod 3
Above Bank 1
Содержание N6746A
Страница 4: ...iv ...