Installation Note N5247-90113 29
Installation Procedure for the Upgrade
Step 13. Reinstall the handler, Power and Other I/O Assemblies
1.
Reinstall the handler, power, and other I/O assemblies and fold cables out
of the way of the LFE board to be plugged in (items
through
). Refer
Figure 10
Reinstall handler I/O cable, I/O cable assembly, power I/O assembly, and I/O
Cables.
Содержание N5247-60113
Страница 3: ...3 ...
Страница 4: ...4 ...
Страница 66: ...66 Installation Note N5247 90113 Installation Procedure for the Upgrade ...
Страница 67: ...Installation Note N5247 90113 67 Installation Procedure for the Upgrade ...
Страница 68: ...68 Installation Note N5247 90113 Installation Procedure for the Upgrade ...
Страница 75: ...Installation Note Xxxxx xxxxx 3 ...