24 Installation Note N5245-90109
Upgrade Kit Order Numbers: N5244AU-921 and N5245AU-921
-
Step 15.Install the Test Set Cables
PNA Options 400/419/423 Only
Install the following cables in the order listed. To see images showing the
location of these cables, refer to
and
. New parts are listed in
— W135 (N5245-20082) A56 port 1 noise bypass switch to A42 port 1 bias tee
— W137 (N5245-20105) A57 port 2 noise bypass switch to A45 port 2 bias
tee
Figure 9
Option 400/419/423 Only: N5245-20082 Cable Installation
Follow instructions carefully when making cable connections, especially
wire harness connections. Incorrect connections can destroy components,
resulting in additional customer costs.
Use a 5/16-in torque wrench set to 10 in-lbs on all cable connections
except the front and rear panel bulkhead connectors. Torque these
connections to 21 in-lb.