16 Installation Note N5222-90129
Installation Procedure for the Upgrade
-
“Step 19. Assemble the A8 26.5 GHz Source 2 Assembly.”
“Step 20. Install the A8 26.5 GHz Source 2 Assembly.”
“Step 21. Install the *NEW* A11 (x4) Direct Digital Synthesizer (DDS)
Assembly and Cables.”
“Step 22. Install the Test Set Cables.”
“Step 23. Reinstall the A19 Test Set Motherboard.”
“Step 24. Install Cables on the A19 Test Set Motherboard.”
“Step 25. Replace the Front Panel’s Lower Dress Panel.”
“Step 26. Reinstall Front Panel Assembly.”
“Step 27. Install the Overlay.”
“Step 28. Install the Front Panel Jumper Cables.”
“Step 29. Position the Cables and Wires to Prevent Pinching.”
“Step 30. Reinstall the Inner Cover.”
“Step 31. Reinstall the Outer Cover.”
“Step 32. Remove Option 217 License.”
“Step 33. Enable Options 417.”
“Step 34. Perform Post-Upgrade Adjustments and Calibration.”
“Step 35. Prepare the PNA for the User.”
Step 1. Obtain a Keyword and Verify the Information
Follow the instructions on the Software Entitlement Certificate supplied to
obtain a license key file for installation of this upgrade. Refer to
.
Verify that the model number, serial number, and option number information
on the license key match those of the instrument on which this upgrade will be
installed.
If the model number, serial number, or option number do not match those on
your license key, you will not be able to install the option. If this is the case,
contact Keysight for assistance before beginning the installation of this
upgrade. Refer to
“Contacting Keysight” on page 4
Once the license key file has been received and the information verified, you
can proceed with the installation at step 2.
If the model number, serial number, or option number do not match those
on your license key file, you will not be able to install the option. If this is
the case, contact Keysight for assistance before beginning the installation
of this upgrade. Refer to
Содержание N5221BU-677
Страница 53: ...Installation Note Xxxxx xxxxx 3 ...