Keysight M9514A Site Preparation and Installation Guide
35
Procedure
Rack Mount the Chassis
Installing Multiple Chassis in a Rack
Up to three M9514A (13U) chassis may be installed in a standard 42U rack. All of
the major field replaceable units (fan trays, power supplies, etc.) can be replaced
while the chassis is installed in a rack.
1
Start by installing the support rails and chassis one EIA unit up from the
bottom of the rack. This prevents the rack base cover from interfering with the
chassis. See
below.
To prevent tipping the rack, always install chassis starting from the
bottom of the rack and work your way up.
Figure 8
For multiple chassis in a rack, install the first one at the bottom of the rack
(left side panel removed for visibility in photo)
Chassis support
Rack base
~1 unit gap
between
bottom of
Содержание M9514A
Страница 1: ...Keysight AXIe 14 Slot Chassis M9514A SitePreparationand Installation Guide...
Страница 2: ......
Страница 6: ...vi...
Страница 14: ...16 Keysight M9514A Site Preparation and Installation Guide Introduction Plan the Chassis Installation...
Страница 37: ...Keysight M9514A Site Preparation and Installation Guide 39 Service and Support Additional Information...
Страница 40: ...42 Keysight M9514A AXIe 14 Slot Chassis Safety Related Specifications...
Страница 44: ...46 Keysight M9514A Site Preparation and Installation Guide Power Cords...