Verification 9
2
Verification
Introduction
This chapter provides test procedures for checking the operation of Keysight Series 669xA power supplies. The required
test equipment is specified and sample performance test record sheets are included. Instructions are given for performing
the tests either from the front panel or from a controller over the GPIB.
Tests
Two types of procedures are provided: Operation Verification tests and Performance tests.
Type of Test
Purpose
Operation Verification
These tests do not check all parameters, but comprise a short procedure to verify that the power
supply is performing properly.
Performance
These tests verify all the Specifications (not Supplementary Characteristics) listed in Table 1-1
of the Power Supply Operating Manual.
If you encounter failures or out-of-specification test results, see Troubleshooting Procedures (Chapter 3). The procedures
will determine if repair and/or calibration is required.
Note
The power supply must pass the selftest at power-on before the following tests can be performed. If the
power supply fails selftest, go to Chapter 3.
Test Equipment Required
Equipment List
Table 2-1 lists the equipment required to perform the tests given in this chapter. Only the equipment marked with the
superscript "
1
'' is needed for the Operation Verification test.
Current-Monitoring Resistor
The four-terminal, current-monitoring resistor (current shunt) listed in Table 2-1 is required to eliminate output current
measurement error caused by voltage drops in leads and connections. The specified current shunts have special
current-monitoring terminals inside the load connection terminals. The accuracy of the current shunt must be 0.04% or
better. Connect the current monitor directly to these current-monitoring terminals.
Electronic Load
Many of the test procedures require the use of a variable load capable of dissipating the required power. If a variable
resistor is used, switches must be used for connecting, disconnecting, and shorting the load resistor. For most tests, an
electronic load (see Table 2-1) is easier to use than a variable resistor. However, an electronic load may not be fast enough
for testing transient recovery time or may be too noisy for testing noise (PARD). In these cases, fixed load resistors of
suitable power dissipation can be used with minor changes to the test procedures given in this chapter.
Содержание 669 A Series
Страница 2: ...Service Manual Keysight Series 669xA GPIB DC Power Supplies ...
Страница 3: ......
Страница 27: ......
Страница 56: ...Troubleshooting 53 Figure 3 15 3 Inch Front Panel Frame Assembly ...
Страница 57: ...54 Troubleshooting Figure 3 16 Assembly A10 Exploded View ...
Страница 58: ...Troubleshooting 55 Figure 3 17 Assembly A10 Exploded View 6690A ...
Страница 59: ...56 Troubleshooting Figure 3 18 Assembly A10 Exploded View 6691A 6692A ...
Страница 60: ...Troubleshooting 57 Figure 3 19 Three Phase Line Choke Subchassis Wiring ...
Страница 61: ...58 Troubleshooting Figure 3 20 24 Volt Fan Transformer ...
Страница 77: ...74 Diagrams Figure 6 1 Test Point Waveforms for Table 6 3 sheet 2 of 2 ...
Страница 79: ...Figure 6 3 A1 Front Panel Board Assembly Diagram ...
Страница 81: ...Figure 6 5 A2 GPIB Board Component Location ...
Страница 83: ...Figure 6 7 A3 FET Board Component and Test Point Location ...
Страница 87: ...Figure 6 11 A4 AC Input Board Component and Test Point Location 12 9 10 11 ...
Страница 89: ...Figure 6 13 A5 DC Rail Board Component and Test Point Location 13 14 ...
Страница 91: ...Figure 6 15 A6 Bias Board Component and Test Point Location 15 16 17 18 19 19 20 22 ...
Страница 94: ...Figure 6 17 Power Mesh Schematic Diagram All Models ...
Страница 103: ......