Operational Check
U3022BH10
Verifying Operational Check Failures
If your test results fail the Operational Check limits, verify following:
1. Ensure that the Test Set is turned on and connected properly to the PNA-X.
2. Check all appropriate PNA-X and Test Set connectors for damage, cleanliness, and proper
torque.
3. Repeat the relevant 1-Port calibrations.
4. Verify that the PNA-X is operating properly and meeting its published specifications. If the
PNA-X is connected to the Test Set it will fail the Operational Check. Refer to
"Network Analyzer Requirements" on page 12
24-Port System Interconnect Cable Verification
configuration, you can use a similar concept.
2. If more details are needed for troubleshooting the U3022BH10, refer to the
94
U3022BH10 User's and Service Guide
Содержание U3022BH10
Страница 7: ...U3022BH10 U3022BH10 Option 129 U3022BH10 User s and Service Guide 7...
Страница 30: ...U3022BH10 Figure 18 Test Set RF Path Diagram System Setup 14 Ports 30 U3022BH10 User s and Service Guide...
Страница 105: ...Figure 83 14 Port System Option 129 U3022BH10 Test Set and System Block Diagrams U3022BH10 User s and Service Guide 105...