U3022AH10
System Configurations
System Setup N5242A PNA-X
The opening of covers or removal of parts is likely to expose dangerous
voltages. Disconnect the instrument from all voltage sources while it is being
opened.
Preparing the PNA-X Network Analyzer
1.
Remove the feet from the bottom of the network analyzer. Refer to
Figure
7
Rear Bottom Feet
3. Install the two rear locking feet (5023-0132) using the included screws (0515-1619),
where the standoffs were removed. Refer to
Figure
8
Install Locking Feet
Standoffs (x2)
Feet (x4)
Locking Feet
(5023-0132)
Screws (0515-1619)
Included in package
2. Remove the two lower standoffs and screws (0515-1619) from the rear panel on
the network analyzer.
22
U3022AH10 User's and Service Guide
Содержание U3022AH10
Страница 7: ...U3022AH10 U3022AH10 Option 129 U3022AH10 User s and Service Guide 7...
Страница 9: ...U3022AH10 Introduction Figure 3 PNA X with U3022AH10 Option 129 U3022AH10 User s and Service Guide 9...
Страница 30: ...System Configurations U3022AH10 Figure 18 Test Set RF Path Diagram 30 U3022AH10 User s and Service Guide...
Страница 91: ...U3022AH10 User s and Service Guide 91...