Keysight Double-Pulse Test Rack and Safety Enclosure Operation Guide
15
Plan the Rack and Safety Enclosure Site Installation
Introduction
Plan the Rack and Safety Enclosure Site Installation
Customer Responsibilities
The final location at customer site must meet the following requirements prior to
the installation. Details on these requirements are provided in the
PD1500A
System Installation Guide
.
The Rack and Safety Enclosure is a free-standing rack with test instruments
installed and a Safety Enclosure or hood on top. Consider your anticipated
location and requirements to ensure safety and optimize access to test and
control instrumentation.
Receiving the Rack
Make sure that all doors, elevators, and passageways in route to the final
location are large enough to accommodate the Rack and Safety Enclosure and
are capable of carrying the weight.The Rack and Safety Enclosure exceeds
150 kg (plus the weight of the shipping crate). Use a mechanical lift to lift the
rack. The rack has casters for moving around on a level floor.
The crated physical specifications for the rack are listed below. Floor elevators
and lifting equipment must be of sufficient capacity. If the rack shipping crate is
damaged upon receipt, request that the carrier's agent be present when the
Receive the Double-Pulse Test Solution (multiple shipping containers).
Ensure the operating environment (space, noise, etc.) is suitable.
Electrical and environmental requirements are met.
Provide a qualified electrician to do one of the following.
•
permanently hard wire the free end to the AC power source
or
•
attach an IEC 60309 AC power plug (L+N+P 6h is recommended) to the AC power cable
(a matching IEC 60309 AC Power receptacle must also be installed). IEC 60309
connectors are not included with the PD1500A system.
Host Computer requirements are met.
Additional supplies (host computer, LAN cable, etc.) are not included.
A Keysight Application Engineer can come to your site to install
all of the DPT test instruments and test fixtures in the Rack and
Safety Enclosure and test it for functionality. Refer to the
PD1500A System Installation Guide
.
Содержание PD1500A
Страница 2: ......
Страница 10: ...x ...
Страница 12: ...xii Keysight DPT Rack and Safety Enclosure Operation Guide ...
Страница 20: ...20 Keysight Double Pulse Test Rack and Safety Enclosure Operation Guide Introduction Rack Ventilation ...
Страница 31: ......