![Keysight Technologies N6900 Series Скачать руководство пользователя страница 83](http://html1.mh-extra.com/html/keysight-technologies/n6900-series/n6900-series_operating-and-service-manual_1962217083.webp)
Power Dissipator Connections
Power Dissipator Connections - 1 kW Units
Power Dissipator Connections - 2 kW Units
The N7909A Power Dissipator
The N7909A power dissipator is required to provide 100% of the rated current-sink capability of the
APS models. For further information about current sinking, refer to
The dimensions of your power dissipator as well as an outline diagram are given under
Fans cools the power dissipator by drawing air through the sides and exhausting it out the back. Do
not block the air intake at the sides of the instrument or the exhaust at the rear of the instrument.
Additional installation requirements are as follows:
l
Only install the power dissipator in a location that allows sufficient space of at least 50 mm (2
inches) at the sides and back of the unit for adequate air circulation.
l
The power dissipator may be located anywhere near the power supply (above, below, or adja-
cent), as long as the power dissipator is physically located within 1 meter of the power supply.
l
Turn off the power supply before connecting any power dissipator units. The power dissipator is dis-
covered at power-on and is automatically enabled.
l
Use only the supplied CAT6A cable for the interface connections. Snap the cable into the P2 con-
nectors. When installing a second power dissipator on 2 kW units, connect the second CAT6A
cable into the P4 connector on the power supply. Do not use other LAN cables as they will not
work properly. The supplied CAT6A cable is shielded and uses the shield as a conductor.
Never plug the CAT6A cable into the LAN connector, or the unit will be damaged.
l
Use the fabricated power cable for the power (P1) connections (see below). Snap the cable into
the P1 connectors. When installing a second power dissipator on 2 kW units, connect the second
power cable into the P3 connector on the power supply.
Power Cable Fabrication
Two end-connectors are included with the power dissipator. You must provide the cable wiring. The
following illustration provides assembly details. Briefly:
l
Keep wire length to one meter or less, or the power supply will not meet its published spe-
cifications.
Keysight N6900/N7900 Series Operating and Service Guide
83
2 Installing the Instrument
Содержание N6900 Series
Страница 1: ...Keysight Advanced Power System N6900 N7900 Series Operating and Service Guide...
Страница 2: ......
Страница 63: ...1 kW Models Keysight N6900 N7900 Series Operating and Service Guide 63 1 Quick Reference...
Страница 64: ...2 kW Models 1 Quick Reference 64 Keysight N6900 N7900 Series Operating and Service Guide...
Страница 78: ...2 Installing the Instrument 78 Keysight N6900 N7900 Series Operating and Service Guide...
Страница 90: ...Rack Mounting 2 Installing the Instrument 90 Keysight N6900 N7900 Series Operating and Service Guide...
Страница 289: ...Status Diagram 6 SCPI Programming Reference 289 Keysight N6900 N7900 Series Operating and Service Guide...
Страница 354: ...Cover screws 8 Service and Maintenance 354 Keysight N6900 N7900 Series Operating and Service Guide...