Keysight N5290/1A Installation Guide 3-11
System Installation
PNA, Controller, and Test Head Module Interconnections
8.
Remove semirigid cables from SOURCE OUT to CPLR THRU. Refer to
.
9.
Connect 50 ohm terminations to CPLR THRU ports (1810-0818). Refer to
.
Figure 3-6
Remove Semirigid Cables and Connect 50 termination to the CPLR THRU
Ports