44 Installation Note N5245-90113
Description of the Upgrade
Installation Procedure for the Upgrade
-
Step 40. Prepare the PNA for the User
— If necessary, reinstall front jumper cables.
— If necessary, reinstall the cable guards, pushing them over the front jumper
cables until the cushioning material touches the front panel of the PNA.
— Install the dust caps on the test ports.
— Clean the analyzer, as needed, using a damp cloth.