Keysight N5224A/25A Service Guide 7-55
Repair and Replacement Procedures
Removing and Replacing the Fans
Removing and Replacing the Fans
Tools Required
— T-10 TORX driver (torque to 9 in-lb or 1.02 N.m)
— T-20 TORX driver (torque to 21 in-lb or 2.38 N.m)
— Pozidriv screw driver
— 5/16 inch open-end torque wrench (torque to 10 in-lb or 1.13 N.m)
— ESD grounding wrist strap
Removal Procedure
Refer to
for this procedure.
1.
Disconnect the power cord.
2.
Remove the outer and inner covers. Refer to
.
3.
Remove the front panel assembly. Refer to
Front Panel Assembly” on page 7-8
.
4.
Remove the power supply bracket. It is not necessary to remove the entire
power supply, just the power supply bracket. Refer to
Replacing the A20 Power Supply Assembly” on page 7-22
5.
Remove screws (item
①
) (five on the right side and seven on the left side)
that attach the fan brackets to the chassis.
6.
Remove three screws (item
➁
) on both sides that attach the rear panel to
the fan bracket.
7.
Raise the fan bracket out of both sides in the analyzer just enough to
access the fan cables. Disconnect the fan cables from the A18 system
motherboard connectors (item
③
).
8.
Remove the fan brackets and fans from the analyzer.
9.
To remove a fan or fan guard from the fan bracket:
a.
Before removing a fan or fan guard, note the orientation of each fan
and fan guard for reinstallation.
b.
Pull up the center pin of each of the fan rivets as shown by (item
④
)
in the illustration.
c.
Pull out the rivet completely (as shown by (item
⑤
) in the
illustration) to release the fan and fan guard.
Replacement Procedure
1.
Reverse the order of the removal procedure.
Содержание N5224A
Страница 124: ...4 52 Keysight N5224A 25A Service Guide Troubleshooting Instrument Block Diagrams Sheet 2 4 ...
Страница 132: ...5 8 Keysight N5224A 25A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 149: ...Keysight N5224A 25A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 6 4 Port Receiver Group ...
Страница 150: ...5 26 Keysight N5224A 25A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 7 2 Port Receiver Group ...
Страница 266: ...6 110 Keysight N5224A 25A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 346: ...8 18 Keysight N5224A 25A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...