Keysight N5221A/22A Service Guide 3-13
Tests and Adjustments
Preliminary Checks
4.
If shorts and opens are not connected to all ports, you will be prompted to
connect them as they are needed.
5.
The result of the operator’s check will be shown as a PASS or FAIL next to
). The PNA Operator’s Check dialog box will
look different for different PNA model numbers and installed options.
Some of the tests are performed only if the appropriate options are
installed in the PNA.
Figure 3-3
Operator’s Check Dialog Box
Содержание N5221A
Страница 9: ...Contents Keysight N5221A 22A Service Guide 10 ...
Страница 10: ...11 Keysight N5221A 22A Service Guide Contents ...
Страница 132: ...5 8 Keysight N5221A 22A Service Guide Theory of Operation Synthesized Source Group Operation 5 Figure 5 3 Source Group ...
Страница 148: ...5 24 Keysight N5221A 22A Service Guide Theory of Operation Receiver Group Operation 5 Figure 5 6 4 Port Receiver Group ...
Страница 149: ...Keysight N5221A 22A Service Guide 5 25 Theory of Operation Receiver Group Operation Figure 5 7 2 Port Receiver Group ...
Страница 156: ...5 32 Keysight N5221A 22A Service Guide Theory of Operation Power Supply Group Operation 5 ...
Страница 264: ...6 108 Keysight N5221A 22A Service Guide Replaceable Parts Replaceable Parts Listings 6 ...
Страница 328: ...7 64 Keysight N5221A 22A Service Guide Repair and Replacement Procedures Post Repair Procedures 7 ...
Страница 346: ...8 18 Keysight N5221A 22A Service Guide General Purpose Maintenance Procedures Correction Constants 8 ...