
Getting Started Guide 21
Quick Start
Location and Mounting
Location and Mounting
It is recommended to suspend the transceiver above the Device Under Test
(DUT), with the mmWave port pointed downwards at the DUT, so that heat
given off by the transceiver will rise away from the DUT. Leave a minimum
clearance of 2.5 inches (7 cm) around the transceiver. Also, ensure there is
enough room to attach all necessary cables between the transceiver and other
devices.
Do not place the transceiver against any surface in such a way as to block its
ventilation openings. Interfering with ventilation airflow can cause the
transceiver to overheat.
Содержание M1749A
Страница 4: ...4...
Страница 22: ...22 Getting Started Guide Quick Start Location and Mounting...
Страница 36: ...36 Getting Started Guide Functionality Control...