14 Keysight 16190B Performance Test Kit
Operation
Making Connection
2-
Making Connection
Connecting terminations directory
1. The connector nut outside the 7-mm connector on the test head mounted
on the top of the test fixture stand should be turned clockwise viewed from
the top, then lift connector sleeve completely out.
Figure 2-1
Lifting out 7mm connector sleeve
2. While pressing terminations from the top as shown in
connect it to the 7-mm terminal, clockwise viewed from the top
Figure 2-2
Termination connection
When making connections with the verification devices, turn the nut on
the device, never turn the device itself. Doing so can cause damage to the
device or to the attaching connector.
When making connections, a 3/4 inch, 136 N-cm torque wrench (PN
8710-1766) is necessary. A 1/2 inch open end wrench may also be
necessary to hold one device stationary while torquing the nut on the other
device.
Содержание 16190B
Страница 1: ...Operation and Service Manual Keysight 16190B Performance Test Kit...
Страница 4: ...4 Keysight 16190B Operation and Service Manual Contents...
Страница 10: ...10 Keysight 16190B Performance Test Kit General Information Characteristics 1...
Страница 20: ...20 Keysight 16190B Performance Test Kit Service Repair 3...