0. HANDLING INSTRUCTIONS
0.1
LIST OF CONTENTS
The Keston Qudos 28s and Qudos 28sP are supplied almost totally pre-assembled. The units
use standard 50 mm muPVC (BS5255 and/or BSEN1566-1 and BSEN1329) pipe for the flue
and air intake systems. The boiler is packed in a single box without additional flue kit. All
additional components are packed inside the boiler cabinet itself. The following is a list of
components and their location in the boiler cabinet
Equipment List
Item
Quantity
Location
Wall Bracket Rawl Plugs
6
Inside accessories bag
Wall Bracket Wall Fixing Screws
6
Inside accessories bag
Wall Mounting Bracket
1
Secured to inside right
hand side of boiler case
Wall Mounting Bracket Nuts
1
Inside accessories bag.
Wall Mounting Bracket Washers
1+1
Inside accessories bag
Wall Bracket Bolt Insulation
1
Inside accessories bag
50 mm muPVC Air/Flue Terminals
2
Inside accessories bag
Air Inlet Spigot (50 mm)
1
Inside accessories bag
Flue Outlet Spigot (50 mm)
1
Inside accessories bag
Air Inlet Spigot Gasket
1
Inside accessories bag
Air Inlet Flue Outlet Spigot M6 Screws 4+2
Inside accessories bag
Cabinet Cable Entry Clamps
2
Inside accessories bag
Gas Isolating Cock
1
Inside accessories bag
Condensate Trap
1
Inside accessories bag
Condensate Trap fixing screws
2
Inside accessories bag
Condensate Trap fixing washers
2
Inside accessories bag
Condensate Trap Gasket
1
Inside accessories bag
50 mm muPVC Pipe
2
Inside boiler case
50 mm muPVC Elbow
2
Inside boiler case
Document List
Item
Quantity
Location
Registration of Purchase
1
In A4 envelope
Installation Template
1
In document bag
Remove the cabinet shell by removing the two retaining screws in the top of the cabinet and
the two retaining screws in the bottom of the cabinet.
0.2
RECOMMENDED HANDLING PROCEDURE
NB : The following lift operation exceeds the recommended weight for a one-man lift as
specified in the Manual Handling Operations 1992 Regulations.
For the carriage of carton it is recommended at least two people perform any lift. Clear the
carriage route of the carton from point of delivery to point of installation. Take care to avoid trip
hazards, slippery or wet surfaces and when climbing steps and stairs. Always use assistance
if required. If a sack truck is used it is recommended the carton is strapped to the truck.
For the unpacking of the appliance from the carton, it is recommended at least two people
perform any lift. It is recommended to cut the base end of carton and open the carton flaps.
Ensure the protective packing over the boiler tappings at the base of the boiler is kept in place,
then tilt the boiler forwards from its back onto its base and remove carton by sliding up over
the boiler. When lifting this appliance the back should be kept straight at all times. Avoid
WD420/3/2007
The Keston Qudos 28s & Qudos 28sP Boilers
Page : iii