background image

 

TECHNICAL

 

DATA

 

SHEET

 

T.D.S.

 

NO.

 

4.2

 

 

 

PCN:

 

______

 

Supercedes

 

PCN:

 

_____

 

Date

 

03

10

06

 

 

4.1.1

 

Remove

 

the

 

wiper

 

box

 

seals

 

and

 

cap/plug

 

the

 

seal

 

opening.

 

4.1.2

 

Clean

 

the

 

pump

 

outer

 

surfaces

 

prior

 

to

 

painting.

 

4.1.3

 

If

 

painting

 

is

 

required

 

mask

 

crank

 

and

 

lubricator

 

shaft

 

surfaces

 

and

 

keyways.

  

If

 

painting

 

does

 

not

 

apply,

 

go

 

to

 

Para.

 

4.1.8.

 

4.1.4

 

Paint

 

as

 

specified

 

by

 

the

 

customer

 

order

 

or

 

as

 

required.

 

4.1.5

 

Apply

 

a

 

thin

 

layer

 

of

 

grease

 

to

 

the

 

exposed

 

oil

 

seal

 

lips.

 

4.1.6

 

Apply

 

a

 

thin

 

layer

 

of

 

heavy

 

rust

 

preventative

 

to

 

the

 

exposed

 

crank

 

and

 

lubricator

 

shaft

 

surfaces

 

and

 

keyways.

 

4.1.7

 

Wrap

 

the

 

exposed

 

crank

 

and

 

lubricator

 

shafts

 

with

 

waxed

 

tape.

 

4.1.8

 

Carefully

 

wrap

 

the

 

following

 

parts

 

prior

 

to

 

placing

 

them

 

into

 

polyurethane

 

bags.

  

Oil

 

level

 

gages,

 

lube

 

pressure

 

gages,

 

and

 

breather

 

caps.

 

4.1.9

 

Finish

 

box,

 

crate

 

and

 

mark

 

the

 

parts

 

from

 

Para.

 

4.1.2

 

after

 

final

 

inspection

 

(see

 

Para.

 

4.2.2).

 

4.2

 

Shipping/Receiving

 

(New

 

Pumps

 

Only)

 

4.2.1

 

All

 

pumps

 

and

 

accessories

 

(as

 

applicable)

 

will

 

be

 

final

 

inspected

 

by

 

Kerr

 

Pump

 

personnel

 

prior

 

to

 

shipping.

  

Any

 

witnessed

 

or

 

third

 

party

 

inspection

 

will

 

be

 

signed

off

 

by

 

the

 

purchaser

 

or

 

customer

 

representative

 

prior

 

to

 

final

 

crating

 

and

 

shipment.

 

4.2.2

 

Export

 

crating

 

will

 

be

 

performed

 

by

 

either

 

an

 

approved

 

Kerr

 

Pump

 

source

 

or

 

as

 

specified

 

by

 

the

 

purchaser

 

or

 

customer.

  

Any

 

third

 

party

 

inspection

 

will

 

be

 

coordinated

 

with

 

the

 

source.

 

4.2.3

 

Upon

 

receipt

 

of

 

the

 

shipment,

 

the

 

purchaser

 

or

 

customer

 

is

 

responsible

 

for

 

inspection

 

and

 

repair

 

of

 

damaged

 

coatings

 

at

 

the

 

expense

 

of

 

the

 

shipper.

 

5.0

 

WARRANTY/START

UP

 

5.1

 

Pumps

 

prepared

 

per

 

the

 

above

 

procedure

 

qualify

 

for

 

the

 

“Standard

 

Terms

 

&

 

Conditions”

 

in

 

force

 

on

 

the

 

date

 

of

 

shipment.

 

5.2

 

If

 

the

 

pump

 

storage

 

period

 

is

 

less

 

than

 

6

 

months,

 

follow

 

the

 

Short

 

Term

 

Pump

 

Preparation

 

Procedure.

 

5.3

 

Prior

 

to

 

start

up:

 

5.3.1

 

Remove

 

all

 

storage

 

caps,

 

plugs,

 

and

 

covers.

   

5.3.2

 

Replace

 

any

 

damaged

 

or

 

cracked

 

O

rings

 

or

 

gaskets.

 

5.3.3

 

Inspect

 

power

 

end

 

shaft

 

oil

 

seals

 

and

 

replace

 

if

 

cracked,

 

split

 

or

 

damaged.

 

5.3.4

 

Install

 

crankcase

 

drain

 

plug,

 

lubrication

 

level

 

site

 

glass

 

and

 

breather

 

cap.

 

5.3.5

 

Install,

 

if

 

applicable,

 

any

 

oil

 

pressure

 

and/or

 

temperature

 

gage.

 

5.3.6

 

Check

 

the

 

connection

 

of

 

the

 

plunger

 

and

 

pony

 

rod

 

to

 

the

 

crosshead

 

prior

 

to,

 

and

 

after,

 

initial

 

run

in

 

of

 

the

 

pump.

 

5.3.7

 

Fill

 

the

 

crankcase

 

to

 

the

 

proper

 

level

 

with

 

the

 

specified

 

lubricant.

 

Содержание KP-3300B

Страница 1: ......

Страница 2: ...hin fifteen 15 days of the date of sale C In the event of a claim under this warranty made within the one year warranty period the purchaser must notify the Distributor and the Distributor shall conta...

Страница 3: ...ive product The responsibility of Kerr Pump Corporation is limited to the repairing or replacing defective material manufactured by it provided Kerr Pump Corporation examination discloses to its satis...

Страница 4: ...correct type of packing for particular installation Contact Kerr Pump Corporation if you are unsure Abnormal wear of fluid end parts Abrasive or corrosive fluid Abnormal wear of power end parts Lack o...

Страница 5: ...E D DISCHARGE SHUT OFF VALVE OPTIONAL USED FOR TOTAL SHUT DOWN OR SERVICE ONLY E DISCHARGE AND SUCTION ON EITHER SIDE OF FLUID END ON ALL MODELS F PULSATION DAMPENERS MAY BE USED IN EITHER THE SUCTION...

Страница 6: ...E JOINT PAIR SHOULD BE POSITIONED TO MINIMIZE EFFECTS OF PIPING THERMAL EXPANSION CONTRACTION AND PIPING WEIGHT 8 SUCTION SIZED FOR 1 TO 2 FT SEC MAX FLOW RATE DISCHARGED SIZED FOR 8 TO 10 FT SEC MAX...

Страница 7: ...iller cap in kerosene C Check valves for excessive wear broken or bent springs etc D Check crankshaft bearings for endplay See section on crankshaft E Keep all nuts studs etc tight F Check valve cover...

Страница 8: ...DELS A WING GUIDED VALVES i DISCHARGE VALVES The discharge valve and seat can be exposed by first removing the discharge valve cover cap Once the discharge cover cap has been removed you may lift out...

Страница 9: ...ing the valve body the upper portion of the valve is removed by removal of the valve capscrew spring retainer valve spring and valve spacer sleeve The valve seat is then pulled from the fluid end util...

Страница 10: ...should be replaced There is no value in constantly re tightening leaking packing If your pump is equipped with optional spring loaded packing there is no adjustment in this equipment during its opera...

Страница 11: ...p and down the main axis of the connecting rod This looseness in the wrist pin fit is the most probable cause of knocking which is traceable to the power end of most all pumps The only solution for lo...

Страница 12: ...removed by breaking the plunger connection backing off the packing nut or gland removing the various fluid end bolts and sliding the entire fluid end off the power frame Corrosion may tend to seize th...

Страница 13: ...ating deterioration or contamination by moisture 3 0 PRESERVATIVE PRODUCT 3 1 The specified rust preservative will protect the internal power end parts from corrosion due to atmospheric moisture and m...

Страница 14: ...arty inspection will be signed off by the purchaser or customer representative prior to final crating and shipment 4 2 2 Export crating will be performed by either an approved Kerr Pump source or as s...

Страница 15: ...to prevent preventative deterioration or contamination by moisture 3 0 RUST PREVENTATIVE PRODUCT 3 1 The recommended rust preservative should protect the internal power end parts from corrosion due t...

Страница 16: ...Any witnessed or third party inspection will be signed off by the purchaser or customer representative prior to final crating and shipment 4 2 2 Export crating will be performed by either an approved...

Страница 17: ...SPECIAL TOOLS FOR KP 3300B KP 3300BCB KP 277 PONY ROD WRENCH AP 425 STUFFING BOX NUT WRENCH KAB 53 VALVE WRENCH KP 276 PONY ROD SEAL TOOL...

Страница 18: ...t to remove use a pry bar 3 Inspect Cover Cap O Rings for damage replace if necessary Ball and Seat Valve Instructions Note These instructions cover both O Ring and Gasket type seals O Ring Type Seat...

Страница 19: ...etainer ball and seat assembly shown 10 Remove discharge valve re tainer as illustrated in step 7 and 8 of the suction valve retainer removal Ball and Seat Valve Changing Instructions continued 5 Use...

Страница 20: ...ll and Seat Valve Changing Instructions continued 13 Remove valve seat gaskets or o rings 14 Use screwdriver to remove old gasket or o ring 15 Valve seat gaskets or o rings must be replaced every time...

Страница 21: ...o valve seat Ball and Seat Valve Changing Instructions continued 19 Install valve seat into retainer 20 Install new gasket or o ring prior to installing new valve retainer Add anti seize to hold in pl...

Страница 22: ...with hammer to seat the valve after initial torque Ball and Seat Valve Changing Instructions continued 25 Re torque to 150 ft lbs 26 Apply anti seize to discharge valve seat 27 Insert valve seat in di...

Страница 23: ...ner Ball and Seat Valve Changing Instructions continued 31 Torque valve retainer to 150 ft lbs 32 Use several firm to heavy blows with hammer to seat valve after initial torque 33 Re torque valve reta...

Страница 24: ...ard Pumps do not use suction ball guide and spring Ball and Seat Valve Changing Instructions continued 37 Install cover caps Note Suction Cover Cap shown is for spring loaded suction 38 Install cover...

Страница 25: ...KP 3300B...

Страница 26: ...AB 34S SUCTION VALVE PLUG SPRING LOADED 3 3 KAB 59 PLUG SEAL O RING 9 4 KAB 39S SUCTION VALVE RETAINER SPRING LOADED 3 5 KAB 41 VALVE SEAT 9 6 KAB 42 VALVE SEAT GASKET 6 7 CP 48S SUCTION VALVE SPRING...

Страница 27: ...435 6 375 4 55 75 10 125 5 250 2 504 625 2 NPT 1 4 NPT GENERAL DIMENSIONS FOR KP 3300B 1 1 2 NPT SUCTION 1 1 4 NPT DISCHARGE 14 66 18 8 7 33 24 1 5 355 14 5 43 0 14 75 2 500 27 125 4 25 2 0 12 00 13 5...

Страница 28: ...SKET DISCHARGE ASSEMBLY VALVE KAB 35 KAB 59 CP 48 KAB 44 KAB 40 KAB 41 KAB 42 KP 3300B KAB 59 SUCTION ASSEMBLY VALVE KAB 42 STANDARD KAB 39 KAB 41 KAB 35 KP 17A KAB 36 KPB 29 KAB 35 KAB 37 KP 64CS KP...

Страница 29: ...KP 3300BCB...

Страница 30: ...ANKSHAFT MOTION 000 005 SHAFT END PLAY LUBRICANT P E R C E N T A G E O F T O R Q U E R E D U C T ION REQUIRED WHITE LEA D REDUCE TO R Q UE 25 G R A PHITE REDUCE TO R Q UE 30 O IL REDUCE TO R Q UE 40 G...

Страница 31: ...LVE SEAT 6 7 KAB 42 VALVE SEAT GASKET 6 8 KAB 636 END PORT PLUG 3 9 KAB 635 DISCHARGE VALVE PLUG 3 10 KPB 610 TOP AND END PLUG COVER PLATE 3 11 KAB 44 DISHARGE BALL GUIDE 3 12 CP 48 DISCHARGE VALVE SP...

Страница 32: ...0 FOR LUBRICATOR ALLOW 27 125 2 0 4 25 12 0 13 5 14 66 18 8 24 1 5 355 14 5 43 6 1 1 2 NPT 1 4 NPT SUCTION GENERAL DIMENSIONS FOR KP 3300BCB 1 1 4 NPT DISCHARGE 4 250 28 435 13 1 12 38 6 55 MOUNT 2 NP...

Страница 33: ...ED KAB 39S SUCTION ASSEMBLY VALVE KAB 634S KAB 59 CP 48S KAB 44S OPTIONAL KAB 41M CP 44 3 N DISCHARGE ASSEMBLY VALVE KAB 635 KAB 59 CP 48 KAB 44 KAB 40 KAB 41M CP 44 3 N KP 3300BCB PARTS ILLUSTRATION...

Страница 34: ...Crankshaft 120S 8 2 KP 10 Pan Cover 1 KP 11 Pan Cover Capscrews 10 KP 12 Pan Cover Gasket 1 KP 14 Crosshead 3 KP 14T Crosshead Tapered 3 KP 15 Wrist Pin 3 KP 15A Wrist Pin Bushing 3 AP 16 Breather Cap...

Страница 35: ...Pony Rod Gland Bolted Follower 3 KAB 34 Suction Valve Plug 3 KAB 34SS Suction Valve Plug Stainless Steel 3 KAB 34S Suction Valve Plug Spring Loaded Suction 3 KAB 34S SS Suction Valve Plug Spring Load...

Страница 36: ...etainer 3 KAB 40SS Discharge Valve Retainer Stainless Steel 3 KAB 41 Valve Ball Seat 6 KAB 41M Valve Ball Seat O Ring Style 6 KAB 41S Valve Ball Seat Stanealoy 6 KPB 41 175S Stuffing Box 1 3 4 ID Stee...

Страница 37: ...a Per Set 3 sets CP 58V 0758 875 758 Pressure Rings Only 7 8 3 Ea Per Set 3 sets CP 58V 0758 100 758 Pressure Rings Only 1 3 Ea Per Set 3 sets CP 58V 0758 125 758 Pressure Rings Only 1 1 4 3 Ea Per Se...

Страница 38: ...8 Spring Loaded Packing Set 1 Steel 3 sets KAB 60G 125S 758 Spring Loaded Packing Set 1 1 4 Steel 3 sets KAB 60G 150S 758 Spring Loaded Packing Set 1 1 2 Steel 3 sets KAB 60G 875SS 758 Spring Loaded P...

Страница 39: ...AB 3 KP 93SL 150SS Packing Adapters Spring Loaded Stainless Steel 3 KM 111 875 838 Packing 7 8 3 sets KM 111 100 838 Packing 1 3 sets KM 111 125 838 Packing 1 1 4 3 sets KM 111G 875 858 Packing 7 8 3...

Страница 40: ...Planetary Gear Assembly With 1 1 2 Male Input Shaft 4 5 1 1 AP 330 SAE C 4 Bolt Drive Assembly 1 1 2 Male Input Shaft 1 AP 330H Housing SAE C 4 Bolt Drive Assembly 1 1 2 Male Input Shaft 1 AP 330S In...

Страница 41: ...ug 3 KAB 635SS Discharge Valve Plug Stainless Steel 3 KAB 636 End Port Plug 3 KAB 636SS End Port Plug Stainless Steel 3 KAB 800 875 Plunger Kerramic 7 8 3 KTB 800 100 Plunger Kerramic 1 3 KTB 800 125...

Отзывы: