KERN KFP V40 Скачать руководство пользователя страница 14

KFP V40-IA-e-1211 

 

 

14 

9.2  Check and adjustment of the corner load 

 

 

Check of the corner load: 

 

  Place the test weights in the centre of the load plate 

and tare. 

 

  The balance displays -0-. 

 

 

  Place the test weights successively on all four 

corners. 

  Now the deviations are displayed with sign, write 

down the values. If there are deviations out of the 
tolerances (see chap. 9.1), an adjustment will be 
necessary. 

 

Adjustment of corner load: 

 
Preparation: 

  For a better control of the modifications which occur 

during adjustment, select in the configuration menu 
the highest readability for control purposes. 

  Open connection box 

 
Adjustment rule: 
The corner (weighing cell) with the biggest negative 
deviation must be set to zero. Do not re-adjust this corner 
even after several adjustment sequences. 

 

Adjustment on the analogue print 

 

 

 

Содержание KFP V40

Страница 1: ...elei 1 D 72336 Balingen E Mail info kern sohn com Phone 49 0 7433 9933 0 Fax 49 0 7433 9933 149 Internet www kern sohn com Installation instructions weighing bridge KERN KFP V40 Version 1 1 05 2012 GB...

Страница 2: ...pon acceptance 5 5 2 Packaging return transport 5 6 Unpacking Setup and Commissioning 6 6 1 Installation Site Location of Use 6 6 2 Unpacking Scope of delivery 7 6 3 Assembly levelling 8 6 4 Connectin...

Страница 3: ...e weighing value of material to be weighed It is intended to be used as a non automatic balance i e the material to be weighed is manually and carefully placed in the centre of the weighing plate As s...

Страница 4: ...ring of Test Resources In the framework of quality assurance the measuring related properties of the weighing system and if applicable the testing weight must be checked regularly The responsible user...

Страница 5: ...ed out by a well acquainted specialist with the workings of weighing balances 5 Transport and storage 5 1 Testing upon acceptance When receiving the appliance please check packaging immediately and th...

Страница 6: ...by installing next to a radiator or in the direct sunlight Protect the weighing bridge against direct draughts e g due to open windows and doors Use weighing bridge only in dry environment protect it...

Страница 7: ...d installation site Do not step under the suspended load risk of injury Scope of delivery Weighing bridge with assembled connection cable 4 weighing cell feet Operating instructions Ensure that the co...

Страница 8: ...r to step 2 see Placing the weighing bridge mark and fix the position of the ramps or the foot plates Place the weighing bridge equally on the installation site In the area of the installation site of...

Страница 9: ...unit Initial Commissioning Connection of peripheral devices Adjustment linearization and verification only the complete balance is verifiable i e weighing bridge in conjunction with a suitable display...

Страница 10: ...late of the weighing bridge is an active weighing element the access ramps are passive i e during the weighing process all wheels of the conveying vehicles must rest on the load plate The air gap betw...

Страница 11: ...substances Keep IP protection Protect weighing cells against splash water When using optional ramps or foot plates keep clean the air gap at the edge of the weighing bridge Wipe the surfaces with a da...

Страница 12: ...ct with other objects Electromagnetic fields static charging choose different location switch off interfering device if possible The weighing result is obviously incorrect No zero display with unloade...

Страница 13: ...ed The analogue digital transformation occurs in the display unit Also all the balance and country specific data are stored there 9 1Overview setting regulation tolerances Testing and setting regulati...

Страница 14: ...If there are deviations out of the tolerances see chap 9 1 an adjustment will be necessary Adjustment of corner load Preparation For a better control of the modifications which occur during adjustment...

Страница 15: ...ter VR1 Adjustment of weighing cell J3 takes place at the potentiometer VR2 Adjustment of weighing cell J4 takes place at the potentiometer VR3 Adjustment of weighing cell J5 takes place at the potent...

Страница 16: ...er Overload Protection circa kg Corner Overload Protection circa kg Loadcell Capacity kg KFP 1500V40M 0 160kg 0 kg 0kg 1000kg Platform type Platform dimension mm Loadcell TC Class Max Emax Emin Y n De...

Отзывы: