KERN FCE 15K5N Скачать руководство пользователя страница 2

FCE-N-BA-e-1220 

 

 

 

 

GB 

KERN FCE-N 

Version 2.0 11/2012 

Operating Manual 
Compact balances

 

 

 

 
Table of Contents 

1

 

Technical Data ............................................................................................... 3

 

2

 

Declaration of conformity ............................................................................. 5

 

3

 

Basic Information (General) .......................................................................... 6

 

3.1

 

Proper use ................................................................................................................ 6

 

3.2

 

Improper Use ........................................................................................................... 6

 

3.3

 

Warranty ................................................................................................................... 6

 

3.4

 

Monitoring of Test Resources ................................................................................ 7

 

4

 

Basic Safety Precautions .............................................................................. 7

 

4.1

 

Pay attention to the instructions in the Operation Manual ................................... 7

 

4.2

 

Personnel training ................................................................................................... 7

 

5

 

Transportation & Storage .............................................................................. 7

 

5.1

 

Testing upon acceptance ........................................................................................ 7

 

5.2

 

Packaging / return transport ................................................................................... 7

 

6

 

Unpacking, Setup and Commissioning ....................................................... 8

 

6.1

 

Installation Site, Location of Use ........................................................................... 8

 

6.2

 

Unpacking ................................................................................................................ 8

 

6.2.1

 

Placing ........................................................................................................................................ 8

 

6.2.2

 

Scope of delivery ........................................................................................................................ 9

 

6.2.3

 

Basic structure ............................................................................................................................ 9

 

6.3

 

Mains connection .................................................................................................... 9

 

6.4

 

Operation using a (rechargeable) battery (optional) ............................................. 9

 

6.5

 

Initial Commissioning ............................................................................................. 9

 

6.6

 

Adjustment ..............................................................................................................10

 

6.7

 

Adjustment ..............................................................................................................10

 

7

 

Operation ...................................................................................................... 11

 

7.1

 

Overview of display ................................................................................................11

 

7.2

 

Weighing .................................................................................................................12

 

7.3

 

Taring ......................................................................................................................12

 

7.4

 

Plus/minus weighings ............................................................................................13

 

8

 

Service, maintenance, disposal .................................................................. 14

 

8.1

 

Cleaning ..................................................................................................................14

 

8.2

 

Service, maintenance .............................................................................................14

 

8.3

 

Disposal...................................................................................................................14

 

9

 

Instant help ................................................................................................... 15

 

 

Содержание FCE 15K5N

Страница 1: ...bH Ziegelei 1 D 72336 Balingen email info kern sohn com Phone 49 0 7433 9933 0 Fax 49 0 7433 9933 149 Internet www kern sohn com Operating Manual Compact balances KERN FCE N Version 2 0 11 2012 GB FCE...

Страница 2: ...portation Storage 7 5 1 Testing upon acceptance 7 5 2 Packaging return transport 7 6 Unpacking Setup and Commissioning 8 6 1 Installation Site Location of Use 8 6 2 Unpacking 8 6 2 1 Placing 8 6 2 2 S...

Страница 3: ...m up time 10 minutes Weighing Units g Recommended adjustment weight not added class 3 kg M2 6 kg M2 Stabilization time typical 3 sec Operating temperature 5 C 35 C Humidity of air max 80 not condensin...

Страница 4: ...up time 10 minutes Weighing Units g kg Recommended adjustment weight not added class 15 kg M2 30 kg M2 Stabilization time 3 sec Operating temperature 5 C 35 C Humidity of air max 80 not condensing Wei...

Страница 5: ...cto al que se refiere esta declaraci n est de acuerdo con las normas siguientes F D claration de conformit Nous d clarons avec cela responsabilit que le produit auquel se rapporte la pr sente d clarat...

Страница 6: ...his may damage the measuring system Impacts and overloading exceeding the stated maximum load max of the balance minus a possibly existing tare load must be strictly avoided Balance may be damage by t...

Страница 7: ...efully read this operation manual before setup and commissioning even if you are already familiar with KERN balances Versions in other languages are non binding translations The only binding version i...

Страница 8: ...the device to extreme dampness for longer periods of time Non permitted condensation condensation of air humidity on the appliance may occur if a cold appliance is taken to a considerably warmer envi...

Страница 9: ...ttery optional Lift off the battery cover on the lower side of the balance Connect 9 V compound battery Reinsert the battery cover For battery operation the balance has an automatic switch off functio...

Страница 10: ...ible with the weights of other nominal values but not the optimum for measuring technique Procedure when adjusting Observe stable environmental conditions A warming up time see chapter 1 is required f...

Страница 11: ...FCE N BA e 1220 11 7 Operation 7 1 Overview of display...

Страница 12: ...how Error Overload 7 3 Taring Operation Display Switch on balance by pressing and wait for the 0 display Place the tare vessel on the weighing plate and press the button The balance display goes to 0...

Страница 13: ...on the weighing plate and tare to 0 using the button Example Remove the nominal weight The nominal weight is displayed as negative display Put the test objects subsequently on the weighing plate the r...

Страница 14: ...and wipe with a dry soft cloth Loose residue sample powder can be removed carefully with a brush or manual vacuum cleaner Spilled weighing goods must be removed immediately 8 2 Service maintenance The...

Страница 15: ...o batteries inserted The displayed weight is permanently changing Draught air movement Table floor vibrations The weighing plate is in contact with foreign matter Electromagnetic fields static chargin...

Отзывы: