
DBS-BA-e-1311
25
5.3 Placing
The moisture analyser is delivered in pieces. Check immediately after unpacking all the
parts that the delivery is complete and assemble the individual components as described
below.
1. Fit heat shield.
2. Install wind protection ring, ensuring correct positioning,
on
.
Содержание DBS 60-3
Страница 37: ...DBS BA e 1311 37 7 Menu ...
Страница 65: ...DBS BA e 1311 65 11 1 Pin allocation RS232C interface ...