background image

14. Plac

chan

     

15. Fill 

(The 
(Dist

16. Tes

wat
turn

17. Plac

The

   

ce power co
nnel. 

the basin w
basin holds

tilled water 

st the water

er guiding p

ning fountai

ce lid (F) in

en place dec

ord inside c

with enough

s 0.85 gallo

is recomme

r running an

pad (I) to b

in on. 

nto basin to 

corative rive

cord cover 

     

 water to co
ns of water

ended to red

 

nd adjust th

brush the fou

     

cover the ba

er stones int

 

channel (G

ompletely su

.) 

duce minera

 

he water va

untain face 

asin, make 

to the lid (F

   

G) and press

 

ubmerse pu

al deposits a

alve on the 

to provide 

     

sure the ope

F). 

s cord cove

 

ump (A).   

and bacteria

pump (A) 

a better wa

en side facin

er securely 

a build-up.) 

if needed. 

ater flow wh

ng up.   

 

onto the 

 

Use the 

hen first 

 

Содержание 50048BRZ

Страница 1: ...W E AND _____________ WALL estions pr oy Home il to custo WWW KE D CAR ____________ L FOUN roblems m Customer omerservi NROYHO RE GU _____________ NTAIN missing pa r Service a ce kenro OME CO UIDE ___...

Страница 2: ......

Страница 3: ...ll Spacer Pa 48BRZ 5 INSTRU E THESE I all the way t uld take appr s are firmly ED lips screwd D overs G ads J 50052ST UCTION NSTRUCT through prio roximately tightened river Tra B A bag Pum TST S TIONS...

Страница 4: ...ver from the fountain ster assemb m LED clust o the founta untain body m the water n body ly C brack ter assembly ain body and then remov diffuser D ket into the y C behind d secure wit ve water dif D...

Страница 5: ...re o bracket E the wall bra or under d through th bracket Re tightly toge r K into th er pad J an se a level to oles wallboard o determine NOTE This or profession Then secu acket E sh specified f he h...

Страница 6: ...ith bra tached to th he wall brac for the cord ounting hole nchor is flu please use nnel to the w ake sure the acket on the he wall mak cket E d cover cha es Gently t ush with the e the mount wall wit...

Страница 7: ...I to b in on nto basin to corative rive cord cover water to co ns of water ended to red nd adjust th brush the fou cover the ba er stones int channel G ompletely su duce minera he water va untain face...

Страница 8: ...owere sometimes th ine rk or you are customerser it call us for in is initially on Pump mu acteria build u ns This foun floor and adja environments to a supply c ted on a routi reset button P transfor...

Отзывы: