Kenner KNL502+ Скачать руководство пользователя страница 20

18 

Note:

 

If the “11” is be set, the gate opener won’t work until the PBS system is equipped. The PBS 

system works only when gate opener is closing. The gate opener will return to its open position when 

the obstruction blocks the beam from photo eye. 

Press the “FUNC” button to store the data when you finish setting. The Digital Display will indicate “P9”. 
Now MOTOR2 adjustment is finished. 

8. Set the Safety Photocell Beam System (PBS) (Optional) 

When the Digital Display indicates “P9”, the gate opener enters PBS set mode. 
You can press and release the “INC” or “DEC” button to set or shut off the PBS function. The Digital Display 
indicates “11”, the PBS is available. The Digital Display indicates “00”, the PBS is null.   
 

 

 

     
Press the “FUNC” button to store the data when the PBS is set. The Digital Display will indicate “PA”. 
(Factory set is “00”)   

9. Set the Automatic Closing Time 

When the Digital Display indicates “PA”, the gate opener enters into the setting of automatic closing time 
mode.  Press  and  release  the  “INC”  or  “DEC”  button,  the  Digital  Display  will  show  a  “01”-“99”  which 
indicates the current automatic closing time. The minimum time is 1 second, 99 seconds maximum. Each 
time  you  press  and  release  the  “INC”  button,  the  figure  increases  by  1,  and  the  timing  increases  by  1 
second.  Each  time  you  p

ress  and  release  the  “DEC”  button,  the  figure  decreases  by  1,  and  the  timing 

decreases by 1 second. When the timing is “00”, the automatic closing function is shut off and the gate will 
stay open. 

(Factory set is 60 seconds) 
Press  the  “FUNC”  button  to  store  the  data  when  the  desired  automatic  closing  time  is  set.  The  Digital 
Display will indicate “Pb” 

10. Set the Period of Soft Start 

When the Digital Display indicates “Pb”, the gate opener is ready for setting period of soft start.     
You can press the “INC” or “DEC” button to set the period of soft start. There is 1-9 seconds available in 
setting. Press the “FUNC” button to store the data when the period is set. The Digital Display will indicate 
“PC”.   
(Factory set is 3 seconds)   

11. Set the Fast Running Period (FRP) to Achieve Soft Stop Function (SPP) 

When the Digital Display indicates “PC”, the Fast Running Period for opening or closing gate is adjustable 
by pressing “INC” and “DEC” buttons respectively, and the Soft Stop Function is achieved simultaneously. 
The Soft Stop means the gate opener runs at slow speed during the last period before the gate completely 

closes.  The  Soft  Stop  Period  is  unavailable  by  direct  adjust  but  available  through  adjusting  the  Fast 

Running Period. 

There are two running speeds designed in program, i.e. Fast Running Speed and Soft Running Speed. The 

Fast Running Period is adjustable from 1 to 28 sec. Factory default setting is 15 sec. 

Since  the  GATE  OPENING  OR  CLOSING  RUNING  PERIOD  (GRP)  =  SOFT  START  PERIOD  (STP)  + 

FAST RUNNING PERIOD (FRP) + SOFT STOP PERIOD (SPP), the SPP could be extended by shortening 

the FRP when the GRP and STP are fixed. In other words, SPP = GRP

–STP–FRP.     

Similarly, the Soft Stop Period (SPP) can be shortened through extending the Fast Running Period (FPP). 

E.g. 

When the Soft Start Period (STP) is set at 3 sec, and the GRP is 23 sec, how can we get 4 sec of Soft 

Stop Period (SPP) to meet the requirement? The answer is clear, i.e. we may set the Fast Running Period 

(FRP) at 16 sec (23 

– 3 – 4 =16 sec). 

12. Return to Factory Set 

When the Digital Display indicates “Pd”, press and release the “INC” or “DEC” button. All data will return to 
factory set, the Digital Display indicates “dF”. 

Содержание KNL502+

Страница 1: ......

Страница 2: ...e Opener s Base Plate 8 Step 6 Install the Gate Bracket 8 Step 7 Set the Limit Switches of the opener at left side 9 Step 8 Set the Limit Switches of the opener at right side 10 Mounting the Control B...

Страница 3: ...njury or death 1 READ AND FOLLOW ALL INSTRUCTIONS 2 Installation should be performed by a professional installer 3 Should electricity be required use a certified electrician only 4 Never let children...

Страница 4: ...2 Parts List...

Страница 5: ...essories Parts List Tools Needed Power Drill Tape Measure Level Hammer C Clamps Wire Strippers Phillips Screwdriver Hex Key Wrench 6mm Open End Wrenches 14 17 or Adjustable Wrenches An extra person sh...

Страница 6: ...orrectly and properly installed and in good smooth Features Soft start and soft stop Emergency release key in case of power failure Dual Single gate running mode Adjustable opening closing interval be...

Страница 7: ...ion of swing Gate opener We suggest that you become familiar with instructions and illustrations in this manual This will help insure that your installation is performed in an efficient and profession...

Страница 8: ...6 Step 2 Assemble Arms Step 3 Attach the Arms to Gate Opener Step 4 Determining the mounting positions...

Страница 9: ...7...

Страница 10: ...8 Step 5 Install the Opener s Base Plate Step 6 Install the Gate Bracket...

Страница 11: ...on Rotate the Bottom Collar until after hearing a click of Bottom Limit Switch s contact And then tighten the screw of Bottom Collar Set the left opened Limit Switch Loosen the screw of Top Collar Pus...

Страница 12: ...Rotate the Top Collar until after hearing a click of Top Limit Switch s contact And then tighten the screw of Top Collar Set the right opened Limit Switch Loosen the screw of Bottom Collar Push the r...

Страница 13: ...ontrol box use the deck screws not provided Ensure the control box is installed in a secure surface and at least 100 cm 40 inches above the ground to protect it from rain snow etc which probably cause...

Страница 14: ...s 1 5m length are provided Other cables are subject to site installation requirement and not provided CAUTION Make sure the cable outlet hole in the Control Box is always down during installation so a...

Страница 15: ...13 Connecting of the control board For Pull to Open...

Страница 16: ...nstalled in the Master Gate and ARM 2 is installed in the Slave Gate Alarm Lamp optional The red wire of the alarm lamp should be inserted into either LAMP 11 terminal the white wire into the other on...

Страница 17: ...RED wire of the external receiver should be connected into the 9 terminal Wired Keypad 24VDC optional The RED wire of the wired keypad should be connected into the 9 terminal The BLACK wire of the wi...

Страница 18: ...Interval between Master Slave Gate Setting The open interval can be adjusted by pressing the INC and DEC Buttons respectively The Digital Display will show 0 9 which indicates the interval time 0 mea...

Страница 19: ...is adjusted by pressing INC and DEC buttons respectively The Digital Display will show 1 9 which indicates the stall force levels 1 means the minimum force and 9 is the maximum force Each time you pr...

Страница 20: ...dicate Pb 10 Set the Period of Soft Start When the Digital Display indicates Pb the gate opener is ready for setting period of soft start You can press the INC or DEC button to set the period of soft...

Страница 21: ...ess and release the remote control the gate will move to the programmed closing position and stop While the gate is moving press and release the remote control the gate will stop moving immediately Th...

Страница 22: ...control board The MOTOR terminal should be connected to the MOTOR2 terminal of the control board The DN terminal should be connected to the DLT2 terminal of the control board The COM terminal should b...

Страница 23: ...AC input is connected Check if the fuse in control board is bad 2 Opener powers up but does not run Arm cable loose or disconnected Verify that all of the wires going to the arm are secure and that th...

Страница 24: ...motor cable is away from sources of electrical interference such as electric fences power lines etc 6 Gate opens closes or stops on its own Ensure that the key for manual release is in the lock positi...

Страница 25: ...23 Quick Setting Guide...

Страница 26: ...24...

Страница 27: ...25...

Страница 28: ...26...

Страница 29: ...27...

Отзывы: