background image

Содержание 11066152500

Страница 1: ... INSTALLA ON IN_ COMMERCIAL DRYER or Electric 8575078 Sears Roebuck and Co Hoffman Estates HL60179 U S A www sears com ...

Страница 2: ...our appliance Always read and obey all safety messages This is the safety alert symbol This symbol alerts you to potential hazards that can kill or hurt you and others All safety messages will follow the safety alert symbol and either the word DANGER or WARNING These words mean You can be killed or seriously injured if you don t immediately follow instructions You can be killed or seriously injure...

Страница 3: ...ecifically recommended in this Use and Care Guide or in published user repair instruc tions that you understand and have the skills to carry out m Do not dry articles that have been previously cleaned in washed in soaked in or spotted with gasoline dry cleaning solvents other flammable or explosive substances as they give off vapors that could ignite or explode m Do not allow children to play on o...

Страница 4: ... or sleeping quarters Contact your local building inspector Make sure that lower edges of the cabinet plus the back and bottom sides of the dryer are free of obstructions to permit adequate clearance of air openings for combustion air See Recessed Area and Closet Installation Instructions below for minimum spacing requirements This dryer must not be installed in a mobile home NOTE The dryer must n...

Страница 5: ...le Product Diraensions 29 73 7 era dryer _b 29 73 7 cm 1 I m BACK VEW ELECTRIC _ 40 6 ore I 13 4 10 2 cm 33 dia 2_ 18s _i 46 7 cm _ 251 2 64 8 cm I r 27 Y4 69 2 cm 11 4 3 2 cm 35 88 9 cm 1 2 5cm _ SHDEVEW non coin operated models 7W 18 1 cm coin operated models 7 20 cm O Product Diraensions 27 68 6 cra dryer 63 4 3 2 cm _ _27 68 6 cm t t ELECTRIC 35 6 cm BACK VIEW 13 4 10 2 cm _B dia i 2s7 b 37 _ ...

Страница 6: ...cordance with local codes and ordinances or in the absence of local codes with the National Electrical Code ANSI NFPA 70 latest edition The National Electric Code requires a 4 wire supply connection for homes built after 1996 dryer circuits involved in remode ng after 1996 and all mobile home installations If codes permit and a separate ground wire is used it is recommended that a qualfied electri...

Страница 7: ...a different gas without consulting the serving gas supplier Conversion must be done by a qualified service technician Gas conversion kit part numbers are listed on the gas valve burner base Gas Supply Line Recommended method Provide a gas supply line of 1 2 rigid IPS pipe to the dryer location Pipe joint compounds that resist the action of LP gas must be used Do not use TEFLON _t tape With LP gas ...

Страница 8: ...and insects from entering the home or business Exhaust hood must be at bast 12 30 5 cm from the ground or any object that may be in the path of the exhaust such as flowers rocks or bushes if using an existing vent system clean lint from the entire length of the system and make sure exhaust hood is not plugged with lint Replace any plastic or metal foil vent with rigid metal or flexible metal vent ...

Страница 9: ...ntering themain vent should benomore than 30 A air flow _ B _ _ A Individualdryervent B Main vent Keep air openings free of dry cleaning fluid fumes Fumes create acids which when drawn through the dryer heating units can damage dryers and loads being dried A clean out cover should be located on the main vent for periodic cleaning of the vent system if an exhaust hood cannot be used The outside end...

Страница 10: ...6 Remove cardboard or hardboard from under dryen Now stand the dryer up NOTE If the coin slide and coin box mechanism is installed go to Adjusting Coin Box section 1 Remove the service door of the meter case by lifting it up at the back Install the money accepting device Refer to manufacturer s instructions for proper installation A Slotted rods NOTE Keep a record of a l coin box key numbers A los...

Страница 11: ...e factory installed timer is set to provide 45 minutes 4 pins of drying time when activated by the coin slide Timer cams for 30 minute 6 pins and 60 minute 3 pins drying times are included in the parts bag 5 Start to screw the leveling legs into the holes by hand Use a small amount of liquid detergent to lubricate the screw threads so it is easier to turn the legs Use a 1 inch wrench or socket wre...

Страница 12: ...ced if ordered by key number from Sears Parts The key number is located both on the key and behind the end panel of the coin box If the key number is not available the lock must be drilled out to remove the coin box Fire Hazard Use a new UL Hsted 30 amp power euppmy cord Use a UL listed strain remief Disconnect power before making electricam connections Connect neutral wire white or center wire to...

Страница 13: ...ceptacle of NEMA Type 14 30R The fourth wire ground conductor must be identified by a green cover and the neutral conductor by a white cover 5 Remove center terminal block screw 6 Remove appliance ground wire green with yellow stripes from external ground conductor screw Fasten under center silver colored terminal block screw 7 Connect ground wire green or bare of power supply cord to external gro...

Страница 14: ...lief screw E Neutral center wire Use this method where local codes do not permit connecting cabinet ground conductor to neutral wire 5 Remove center terminal block screw 6 Remove the appliance ground wire green with yellow stripes from the external ground conductor screw Connect appliance ground wire and the neutral wire white or center of the power supply cord under the center silver colored term...

Страница 15: ...nnection Four wire recommended method Three wire if four wire is not available Direct Wire Four wire electrical connection to disconnect box Shapeends of wires into a hook 31f2 8 9 cm _1 I ofwires _ stripped of insulation I_ 5 12 7 cm Strip 5 12_7 cm of outer covering from end of cable Leave bare ground wire at 5 12 7 cm Cut 11f 3 8 cm from 3 remaining wires Strip insulation back1 2 5cm A 3 4 cond...

Страница 16: ...minal block screws Tighten screws 8 Insert tab of terminal block cover into slot of dryer rear panel Secure cover with hold down screw 9 After reattaching the terminal cover connect a separate copper ground wire from the external ground connector screw to an adequate ground If codes permit and a separate ground wire is used it is recommended that a qualified electrician determine that the ground p...

Страница 17: ... a cloth so they will not get lost 2 Remove service door from meter case 3 Remove chute bolt from slide mechanism and remove slide mechanism from meter case B Timing cam C 77metShaft O Drive lug E V shaped notch 4 Insert a narrow fiat blade screwdriver under the timing cam near the timer shaft Gently lift cam straight up and off shaft making sure that the V shaped notch clears the ratchet tooth 5 ...

Страница 18: ...e Mock out keys and or dime inserts are seated properly and ratchet dog is in place with its spnng connected Be sure the proper coin sizing block is in place Part 20 3007 for up to 7 quarters and 1 dime Part 20 3006 for up to 8 quarters and 0 dimes Unless otherwise ordered a I coin chutes are supplied with Part 20 3006 in place 7 Reassemble buffer to bottom of c o n slide and secure with 2 screws ...

Страница 19: ...52 Limited 2 Year Warranty on lViechanical and Electrical Parts For two years from the date of purchase when the dryer is installed in accordance with the instructions in the hstallation Instructions Sears will furnish replacement parts for all defective mechanical or electrical parts including coin boxes and chute assemblies You will be charged for labor Warranty Restriction If the dryer is vente...

Страница 20: ...ay orn_ght U S A on_yt www ooo o oom TO purchase a protection agreement U S A or maintenance agreement Canada on a product serviced by Sears 1 800 827 6655 U S A 1 800 361 6665 Canada Para pedir servicio de reparaci6n Au Canada pour service en frangais a domicilio y para ordenar piezas 1 800 LE FOYERMC 1 888 SU HOGARSM 1 800 533 6937 1 888 784 6427 www sears ca Registered Trademark TMTrademark SM ...

Отзывы: