
20
←
Side vane protection
Install skids on the right and
left sides of the machine
and all guards (1-3).
1
2
ASSEMBLY
1. Open the protective hood on the pasture topper and collect loose parts.
2. Mount the 3-point tower
3. Connect the pasture topper to the tractor’s 3-point linkage
4. Tension the stabilisation wires.
5. Connect the gear to the tractor’s power take-off.
6. Fit the ejection guard at the rear.
7. Fit the side vane protection on the side.
8. Install the front guard plate.
9. Check the belt tension.
10. Do not forget to install the breather plug and fill the gear with oil.
2
Guard plate – front
3
Содержание 35-FMF275
Страница 21: ...21 Table of Contents...
Страница 22: ...22 Table of Contents...