18
9. Follow the steps
a.) Place the rails on a flat surface. The rail consists of 2 sections (delivered as standard). Line up
the sections and assemble them together as a trail for the cutting head unit. Mount the stabi-
lizers in between the 2 sections - do not tighten the bolts yet (sew pictures below)
b.) Assemble the crank handle. The crank is removable and placed where appropriate
ASSEMBLY - RAILS
2 rail beams for each sections
stabilizers - log support
finished assembled rail
Содержание 21-SV500E
Страница 26: ...26 Table of contents DRAWING I CUTTER HEAD FRAME...
Страница 27: ...27 Table of contents DRAWING II HEIGHT ADJUSTER DRAWING III FEET OF CUTTER UNIT...
Страница 28: ...28 Table of contents RAWING IV CUTTING HEAD UNIT...
Страница 29: ...29 Table of contents RAWING V SAWBAND...
Страница 30: ...30 Table of contents DRAWING VI RAIL...