17
18
THE M5 STRIDER SHOULD NOW BE FULLY ASSEMBLED, BUT ADDITIONAL STEPS
ARE REQUIRED (APPLICATION OF LPS AND OPERATION CHECKLIST) BEFORE USING.
WARNING: Perform the operations below before using to make sure the equipment
is fully operational. Failing to test the equipment prior to normal use will void your
warranty and could result in serious injury.
CHECKING FOR PROPER OPERATION
PRE-RIDE CHECKLIST
Please inspect the Strider carefully and thoroughly before using.
�
All Parts Correctly Installed
�
Top to Main Frame Bolts Torqued to 23 Nm (17 ft-lbs)
�
Handle to Hanger-Pedal Mount Bolts Torqued to 23 Nm (17 ft-lbs)
�
Handle to Top Frame Bolts Torqued to 23 Nm (17 ft-lbs)
�
Hanger-Pedal Mount to Pedal Mount Bolts Torqued to 23 Nm (17 ft-lbs)
�
Apply LPS to Inside and Outside Hanger-Pedal Mount Bearings and Bolts (Fig. 19)
�
Apply LPS to each side of both Transport Wheel (J) Bearings (Fig. 20)
�
Apply LPS to Right Rear Bracket Bearing at the base of the Crank Arm (I) (Fig. 21)
�
Handlebar Adjustment Operates Properly
�
Unit Has Been Polished With Paste or Spray Wax and a Clean Cloth
�
Computer Installed, Calibrated and In Working Order
19
20
21
Содержание m5
Страница 1: ...USER MANUAL...