Figure3-17
Crimp the metal terminal
Step 3
Insert the positive wire and negative wire into corresponding insulation crust respectively. If there has
a click sound, it means that the wire have been inserted properly, as shown in Figure3-18.
Figure3-18
Fasten the metal terminal
Step 4
Tighten the sealing nuts of positive connector and negative connector to the corresponding insulation
crusts respectively, as shown in Figure3-19.
Figure3-19
Tighten the sealing nuts
Step 5
Measure the voltage and check if the positive and negative is connected properly and if the voltage
within the input range of the inverter.
Step 6
Insert the positive connector and negative connector to the PV + and PV – terminals (as shown in
Figure3-20) and tighten them. If there has a click sound, it means that the connector have been inserted
properly.