You now need to transfer the
malt pipe to the boiler. In order
to do this you need to fit the
malt pipe handle.
To fit the handle feed one end
of the handle through one hole
in the malt piple. Push the
handle in on one side far
enough so you have enough
clearance on the other side to
feed the handle into the
opposing hole.
Once the handle has been fitted
you can lift/maneuver the malt
pipe easily.
Use the handle to place the
malt pipe into the boiler.