MAINTENANCE MANUAL
Mirage technical manual
page 33 of 65
7. Apply a few drops of Loctite or a few windings of Teflon tape to the threads of the replacement
safety valve and mount in fitting on boiler.
8. Turn mains switch to
“2”, wait until pressure has built up.
9. Check valve and sealing for leakage.
10. Remount hose.
11. Mount cup warmer.
Figure M 14. Use 2 spanners to remove the safety valve from the tube.