KC-P30 Charging Station
Calibrating the device
V1.03
36
© KEBA
6.3.2
Schematic measurement setup
Fig. 6-5: Schematic measurement setup
1
... Test device
2
... Supply terminals (L1, L2, L3 and N)
3
... Pulse LED
4
... Charging socket
a
... Test probes (energy source)
b
... Evaluation unit for pulse LED
c
... Test probes (sink)
A test device is connected to the charging station for the measurement. On
the input side, the test probes are connected to the supply terminals. On the
output side, the test probes are inserted into the contacts of the charging
socket. The pulse LED is evaluated with the evaluation unit.
6.3.3
Activate/deactivate test mode
Test mode is activated and deactivated in the charging station connection
panel. To access the connection panel, the housing cover and the connec-
tion panel cover must be removed. For a description of how to remove the
covers, see "Operating Instructions".