
134
Transistor Tests
Testing the IGBTs, output circuit measurement
E, G, and H Housings
Measurement
To
Value
Measurement
To
Value
+ Terminal
U
0.3 - 0.4
- Terminal
U
0.3 - 0.4
+ Terminal
V
0.3 - 0.4
- Terminal
V
0.3 - 0.4
+ Terminal
W
0.3 - 0.4
- Terminal
W
0.3 - 0.4
R, U, and W Housings
Measurement
To
Value
Measurement To
Value
+ Terminal
U
0.2 - 0.4
- Terminal
U
0.2 - 0.4
+ Terminal
V
0.2 - 0.4
- Terminal
V
0.2 - 0.4
+ Terminal
W
0.2 - 0.4
- Terminal
W
0.2 - 0.4
Testing the braking circuit
Positive Side
Negative lead of meter to positive DC terminal.
Positive lead of meter to PB terminal.
E Housing
Measurement
To
Value
Measurement
To
Value
+ Terminal
PB
0.4
- Terminal
PB
Open
R, U, and W Housings
Measurement
To
Value
Measurement To
Value
+ Terminal
PB
0.3
- Terminal
PB
0.3
G Housing
Measurement
To
Value
Measurement
To
Value
+ Terminal
PB
0.4
- Terminal
PB
1.5
H Housing
Measurement
To
Value
Measurement
To
Value
+ Terminal
PB
0.3
- Terminal
PB
0.3
Negative Side
Positive lead of meter to negative DC terminal.
Negative lead of meter to U/V/W terminals.
Positive Side
Negative lead of meter to positive DC terminal.
Positive lead of meter to U/V/W terminals.
Negative Side
Positive lead of meter to negative DC terminal.
Negative lead of meter to PB terminal.
Multimeter
+ + +
-
Multimeter
+
- - -
Multimeter
+
-
Multimeter
+
-
Содержание COMBIVERT F5
Страница 1: ...COMBIVERT F5 ELEVATOR DRIVE Operation Manual Version 3 33 00F5LUM K333...
Страница 4: ......
Страница 136: ...136 Notes...
Страница 137: ...137...