42
INSTaLLaTION aND CONNECTION
•
Connect the positive and the negative poles (also refer to the label on the back of
the system) to their respective terminals of the two pole plug connector. Use wires
with a cross-section of 1.5 mm
2
(AWG16).
Figure 41: Power on sequence
•
The system begins bootstrap.
3.9 Shutdown
To shut down the system please follow the standard procedure of your operating sys-
tem. After power down procedure is completed, the system will be put in a soft-off state,
front side led will become yellow, and the user will be allowed to switch off power supply
to the system. In this state the system will dissipate negligible power.
An ON/OFF switch is available on the system.
Содержание C6 E22 BM
Страница 1: ...BOOK MOUNT IPC INSTRUCTIONS FOR USE C6 E22 BM C6 E22 BM RVL Original Manual Document 20170810 EN 01...
Страница 2: ......
Страница 34: ...34 Installationand connection 19 182 19 220 Figure 21 C6 E22 BM 71 159 5 Figure 22 C6 E22 BM...
Страница 54: ...54 Technical specifications 7 Technical specifications 7 1 Block Diagram Figure 57 Block diagram...
Страница 61: ...61 Certification...
Страница 64: ......