background image

Installation manual

 

11

 

7) After cleaning, close the isolating valve, and take down the

cleaning system devices and keeping properly for backup.

8) Please contact the waste liquor treating company to treat the

Table.5-2

 

collected waste liquor.

ITEMS 

9) Connect the unit water system as the state before cleaning,

thoroughly check the unit and assist devices whether work

normally. Make sure there is no abnormal situation then

re-operates the unit.

WARNING

 

● The cleaning liquor flow direction must be correctly connected.

● Because different water quality and different using situations of

the heat exchanger, the cleaning period and method will be big

different, the above method is only for reference.

● The double-pipe heat exchanger is internal thread red copper

pipe, so that it can not use nitric acid as cleaning agent!

● The cleaning liquor and neutralization will be irritated and

corrosive to human eyes and skin, so please do well protection

measurements during the cleaning.

● It is strongly suggested that the user calls for professional

cleaning company to do component analysis of the water

quality and scale, and make a effective cleaning solution and

Chromaticity

 

Turbidity NTU 

Smell

 

Visible objects

 

PH Value

 

Total hardness

 

(Take CaCO

for calculation)

 

Fe 
AL 
Mn 

Cu

 

Zn

 

CONCENTRATION (mg/L)

 

≤15

, a

nd can not 

display other colors

 

≤1

 

None

 

None

 

7.5  

9

 

≤200

 

<0

.5

 

<0

.2

 

<0

.1

 

<0

.2

 

≤0.1

 

method, then do the cleaning.

5.7 System water quality requirements and

 

Alkalinity concentration(HCO

3-

)   

70  

300

 

management

 

5.7.1   The unit water system must select the closed cooling 

tower.

 

5.7.2   Circulating Chilled Water Processing Design Standard,

 

Sulfate radicalSO

4

2-

HCO

3-

/SO

4

2- 

Conductivity 

NH

3

CL

-

 

Chlorine

 

5.7.3

 

other index also should meet with the Table.5.2.

 

It should periodically to detect and handle the chilled 
water quality in the water system. When handling the 
water, please make sure with the water dealing person 
to confirm that use any water scale inhibitor and 
antiseptic agent etc. will not have corrosion to the

 

<7

0

 

>1

10 

  500 μs/cm(20°C)

<0.1
<100
<1
<0,05
<5
<100

≤20

stainless steel and copper products.

 

500  

1000

 

H

2

S

 

Free carbon dioxide

 

CO

2

ε 

Nitrate radical

 

NO

3-

Suspended matter

 

Soluble solid 

Oxygen consumption

 

(

Take 

O

2

for calculation

)

≤3

 

<1

 

Ammonium ion

 

(N

H

4

)

SiO

(

Ion state

)

  

<50

 

Содержание AMAZON III W

Страница 1: ...ANUAL AMAZON III W K2F 252 DN3W K2F 280 DN3W K2F 335 DN3W Thank you very much for purchasing our air conditioner Before using your air conditioner please read this manual carefully and keep it for fut...

Страница 2: ......

Страница 3: ...it capacity is not enough or defect in electrical work it will cause electrical shock fire WARNING Use the specified cable and connect tightly and clamp the cable so that no external force will be act...

Страница 4: ...special used occasion Acceptance and Unpacking Ground the air conditioner After the machine arrives check whether it is damaged during Do not connect the ground wire to gas or water pipes lightning r...

Страница 5: ...n table of the main unit in advance for future reference Toggling flathead 1 screw For toggling of indoor and main units Electric wiring Water outlet connector 1 For draining the internal condensed wa...

Страница 6: ...the main unit is installed in a place convenient to connect water refrigerant and electricity Ensure that the noise and exhaust ventilation of the main unit do not affect the neighbors of the propert...

Страница 7: ...tup around the basement Please check the affordability of the roofing to ensure the load capacity Electric control box Position illustration of screw bolt Unit mm B A Compressor after electric Double...

Страница 8: ...tilated and maintenance space Fig 4 9 The1st branching tube Installation space of several main units Main unit 18HP 10HP 8HP Back ventilated and maintenance space Back ventilated and maintenance space...

Страница 9: ...ty 2 Water must enter the double pipe heat exchanger through the inlet otherwise the performance of the unit will decline 3 The inlet pipe of each double pipe heat exchanger in the unit must be provid...

Страница 10: ...bottom of the unit and then rotate 90 to make it firmly assembled And connect a drainage pipe commercially available with the water outlet connector for draining the condensed water of the main unit o...

Страница 11: ...on of the water flow switch Packing should be in good condition and the appearance should be free of damage and deformation If any problem please contact the manufacturer Power wire 5 5 2 Flow switche...

Страница 12: ...er pump Flow direction of liquor Isolating valve Cleaning liquor Double pipe heat exchanger Gate valve of unit water inlet pipe Fig 5 8 Cleaning system schematic diagram of double pipe heat exchanger...

Страница 13: ...professional cleaning company to do component analysis of the water quality and scale and make a effective cleaning solution and Chromaticity Turbidity NTU Smell Visible objects PH Value Total hardnes...

Страница 14: ...increase when it is equal to main pipe piping L1 Equivalent length Piping farthest from the first line 150m L9 j The length of indoor unit aux pipe is 2 no longer than 40m a b j 40m pipe branch equiva...

Страница 15: ...y 1360 we could find out the master unit diameter is 34 9 19 1 base on Table 6 3 Take the large one for the selection we final confirm the main pipe diameter is 41 3 22 2 6 3 Size of joint pipes for i...

Страница 16: ...side of the unit There are a j branching pipes at the inside of the unit the branching pipe diameter should be select as per Table 6 10 B Main pipe at the inside the unit Refer to Table 6 4 unit Qty 2...

Страница 17: ...ector size is 25 4 12 7 The main unit linked by Pipe g3 is 10HP parallel connects with main unit the connective pipe diameter to be selected accord ing to its connector size is 25 4 12 7 plate of valv...

Страница 18: ...he different refrigerants or abuse the tools and measurements which directly contact with refrigerants Correct way Fig 6 8 Don t adopt refrigerant gas for air vacuuming If vacuum level could not get t...

Страница 19: ...actual operation capacity of this main unit Capacity requirement 9 Water flow switch state 0 Open 1 Close 10 T2B T2 average temp Actual value 11 T5 inverter module temp Actual value 12 T7 discharge te...

Страница 20: ...switch S10 ENC4 combination setting the qty of the installed indoor units SW1 Query button SW2 Constraint cooling 1 XT1 Powerline terminal 380 415V 3N 50Hz 60Hz Fig 7 2 NOTE Setting 0 or 1 all mean i...

Страница 21: ...in board Fig 7 6 29 28 27 26 33 25 24 23 22 21 20 19 1 2 18 3 Constraint 4 cooling 5 32 30 Query button 17 6 16 Main unit address dial switch 7 Main unit capacity dial switch 31 8 9 10 11 12 13 14 15...

Страница 22: ...ransformer 18 Port for inverter module voltage inspection Factory Set Cooling priority mode 19 Mutual inductor for DC current inspection Open the priority mode first 20 Activation port of inverter mod...

Страница 23: ...ply to all indoor units in the same system Please do not put the signal wire and power wire in the same wire tube keep distance between the two tubes Current capacity of power supply less than 10A 300...

Страница 24: ...the following conditions Indoor temp 27 C DB 19 C WB Outdoor temp 35 C DB 3 TOCA means the total value of each OC set 4 MSC means the Max current during the starting of compressor 5 Voltage range unit...

Страница 25: ...ld be connected to the control terminal of the water pump stater When the water pump ON OFF signal wire has been connected to strong current it should be wired the signal wires along with other strong...

Страница 26: ...minals of shield wires connect to COMM terminal H1 H2 E H1 H2 E H1 H2 E Signal wire between main units To closed end of shield wire P Q E Signal wire of indoor main units P Q open The indoor unit at t...

Страница 27: ...Main unit master unit Main unit slave unit Main unit slave unit Main unit centralized controller 3 K1 K2 E P amplification PUMP K1 K2 E K1 K2 E K1 K2 E Water pump starter Water pump 1 Fig 7 13 CAUTIO...

Страница 28: ...B A X XT3 T3 XT XT3 3 Power 380 415V 3N 50Hz 60Hz Branch box Branch box Branch box Main unit master unit Main unit slave unit Main unit slave unit Connect to water flow switch terminals Connect to wa...

Страница 29: ...ollers wired controller wired controller wired controller group control all main units in the same water system Branch box Main unit master unit Main unit slave unit Main unit slave unit main unit cen...

Страница 30: ...sure the double pipe heat exchanger have been filled with circulating water and open the water pump and air discharge valve after make sure the air in the water pipelines and unit has been drain out a...

Страница 31: ...kage detector alarming device related to mechanical ventilator Indoor unit OA a Ventilation peristome 8 5 Turn over to customer Be sure to deliver the Installation Manual of the indoor unit and the ma...

Страница 32: ......

Отзывы: