background image

Kaynemaile

®

 Installation Guide : 

Hanging Screens

Fig 1.1

1.

2.

3.

Set Out and Install the Hooks

Prepare the Screen

1.

 

Before setting out the hooks ensure there is 

adequate structure at the fixing locations to 

support the screen. 

2.

  Set out the the top and bottom hook 

positions and ensure they are aligned. The 

outer hooks should be 50-80mm in from 

the ends of each tube. Space the remaining 

hooks across the screen width evenly at a 

maximum of 600mm

3.

  Screw the top hooks part way in to allow for 

final adjustment of the screen once in place.

4.

  Screw the bottom hooks part way in to 

allow for final adjustment of the screen 

once in place.

1.

 

Lay the screen out on the floor with the 

labels on the top side. Position the screen 

so you can identify all corners.

1.

 

The hanging top and bottom tubes may be 

supplied as one piece or multiple pieces 

depending on the screen size. To join 

multiple pieces you must remove the cap 

screws at the join location. This allows the 

tube joiner inserts to slide inside the tubes.

2.

  Once the tube sections have been joined 

together reinsert the cap screws and 

tighten.

Fig 2.1

Fig 2.2

Fig 2.3

Prepare Tubes

=

RH

TOP

BOTTOM

LH

TUBE

TUBE

TUBE JOINER

CAP SCREWS

RING RETAINER

RING RETAINER

^ J^

^ J^

TUBE JOINER

CAP SCREWS

TUBE CLEARANCE

Отзывы: