KAUKAN KAC-1.5 Скачать руководство пользователя страница 13

 

 

   

 

以上表格所示

為標準冷卻器所應使用之電纜線橫截面及保護開關之額定使用電

流,  若有特殊設計,  請查閱測試表上之運轉電流,  來選所適用之電纜線及保護開

關.

 

 

3.

起始運轉須知

 

3-1  預備的檢查

 

檢查如下: 

 

磪認使用主要電源(電壓,頻率)和銘牌標示相符合. 

 

磪認排液管路連接正確. 

 

如果安裝任何閥座,  磪認閥座在開啟位置. 

3-2 

啟動

 

 

直接輸入電源啟動. 

 

在面板上設定所需求之溫度, 

在定溫模式下直接

設定所需求之

箱內冷卻溫度.

   

 

   

 

在面板上表明的溫度是箱內冷卻溫度,  由溫度探測計測量得之.

 

 

3-3

關機

 

 

直接切斷輸入電源來關閉冷卻器. 

 

   

 

如果無法遵守這些操作指導,  將使冷卻機的保固失效 

 

 

 

 

 

 

 

 

 

 

 

Содержание KAC-1.5

Страница 1: ...CONDITITIONER INSTRUCTION HANDBOOK KAUKAN INDUSTRIES CO LTD NO 12 LANE 412 WU FONG ROAD WU FONG TAICHUNG TAIWAN 413 TEL 886 4 23334858 FAX 886 4 23335735 E mail cooler kaukan com tw MODEL Serial No 20...

Страница 2: ...Repair by non authentic service crew d Consumable parts e Failure or damaged from natural affects f Working under the abnormal condition g Working beyond the working range of instruction manual specif...

Страница 3: ...used by improper usage or failing to follow the instruction 1 Only certified engineers who receive sufficient training and fully understand can operate this cooler 2 When installing or servicing the c...

Страница 4: ...alled inside building or inside a room In winter it is best to provide some form of protection against possible damage to the internal components due freezing while the oil cooler is inoperative 2 4 P...

Страница 5: ...RODUCEDURE 3 1 Preliminary inspection Check that The main power voltage and frequency correspond to the values stamped on the chiller s name panel The water pipes are rightly connected 3 2 Starting 1...

Страница 6: ...and hold for 3 seconds 2 To store the setting value temperature or parameter e indicator lamp blue Light is on when compressor is working 4 2 Setting temperature After setting the temperature it takes...

Страница 7: ...t when necessary Never run the chiller without air filter Air gun Blow out dust with compressed air Brush Clean the filter and dry it well 5 SERVICE MAINTENANCE DANGER Disconnect the main power supply...

Страница 8: ...proper instruments 6 5 Filling up the gas into refrigerant circuit a Use tube with 1 4 SAE terminals to connect refrigerant gas bottle to the compressor Release a little refrigerant gas first in orde...

Страница 9: ...nt has to be collected by trained people and sent to proper collecting center The lubricants and oils have to be collected and sent to proper collecting center The frame and components have to be disa...

Страница 10: ...1 2 a b c d e f g 3 4 5 Tel 886 4 23334858 Fax 886 4 23335735 E mail cooler kaukan com tw...

Страница 11: ...1 1 6 28 40 1 1 28 C 35 C 10 C 40 C 1 2 1 2 3 4 5 6 10 7 1...

Страница 12: ...2 2 1 30 2 2 2 3 4 3 R S T E 15 15 NC 93 94 AC220 mm KAC 1 5 0 75 3 KAC 2 1 25 4 KAC 3 1 25 4 KAC 4 1 25 6 KAC 6 1 25 8 2...

Страница 13: ...3 3 1 3 2 3 3 3...

Страница 14: ...4 5 2 1 3 4 4 1 1 a b 2 a b 3 888 3 a b 3 888 4 SET a 5 a 4 2 1 Pon 3 2 SET 3 888 ts 3 ts SET or 4 SET 4...

Страница 15: ...5 5 1 5 2 Air gun Blow out dust with compressed air Brush Clean the filter and dry it well 6 6 1 5...

Страница 16: ...6 2 1 2 3 4 5 6 3 6 4 15 bar 6 5 1 4 SAE 1 4 SAE 75 16 20 bar 4 6 bar 6...

Страница 17: ...6 6 7 7...

Отзывы: