w w w . k a u
-9-
b e r . e u
10.
After connecting the power supply (see page no.15) slide the screen onto the mounted rods and screw
each of the 4 M8 nuts using the included pipe wrench while checking the stability of the entire
installation
(Fig.8).
A properly installed screen must be levelled. Correct the fixing by unscrewing or
screwing the mounting nuts on the appropriate threaded rods.
A properly installed screen is shown below
(Fig.9)
. All connections are countered. Such an installation
protects the screen against the occurrence of vibrations and possible resonances. The movement of the
nuts 1 and 2 allows to accurately level the screen, which is required for the proper operation of the
screen.
Fig.9
Fig.8
CEILING
counter
Nut 1
Nut 2
Pin
SCREEN