LS3 installation guidelines
Carefully follow the assembly instructions listed below
LS3 installation guidelines
Carefully follow the assembly instructions listed below
1
Fit the footplate to the frame using 2 M6x14
screws and 2 M6 self-locking nuts
7
Once lifted, ensure the frame is secured.
13
Depending on the configuration provided,
continue to safely secure all beams following
the previous steps (steps 8 -11).
19
Position the steel shelves on the beams.
2
Using M6x40 bolts (for 50mm upright) or
M6x50 (for 60mm upright) and M6 nuts,
secure the bracing sets to the frame.
See fig A for standard configurations.
8
Place the lowest rear beam in the slot
following the configuration provided.
14
Using a tape measure, measure the bay
diagonally ensuring a maximum tolerance of
+/- 3mm. Repeat this step to ensure an even
diagonal measurement both ways.
20
After completing the assembly, a final
inspection of the system must be carried out
before use.
3
The assembly of this system must be carried
out using professional tools.
To ensure the components are not deformed
by over tightening, please do not exceed a
tightening value of 4.5Nm.
9
at the first end. Raise the next frame & place
the lowest rear beam in the corresponding
slot following the configuration provided.
15
Using a spirit level, check each frame
vertically ensuring a maximum tolerance of
+/- 1mm.
21
Position the chipboard shelves on the
beams.
4
Assemble all the frames following the
configuration provided.
10
Secure the beam connectors using the safety
locking pins provided.
16
After measuring vertically, ensure the frames
are adjusted if needed. Any adjustments
must be made using the correct levelling
shim for the type of footplate supplied.
22
After completing the assembly, a final
inspection of the system must be carried out
before use.
5
When raising the frame, ensure the lower
part is secured to avoid accidental slipping.
11
Raise the next assembled frame & repeat
steps 8 & 9. Place the beam in the intended
location and secure with a safety locking pin.
17
When fixing the frames to the floor, ensure
the floor is drilled using a SDS concrete drill
and SDS 8mm drill bit.
Only drill 100mm deep.
23
Load Boards must be installed in a visible,
easily accessible position.
Hold load board in position against the
upright and mark through holes from rear for
drill positions.
6
Depending on the size of the frame, it is
possible that you may need more people to
support when lifting.
12
Repeat steps 8-11 to safely secure the
second rear beam.
18
Inspect the assembly before positioning the
shelves.
For steel shelves follow steps 19-20 & 23-24.
For chipboard shelves follow step 21 onwards.
24
Drill the load Boards using a standard drill
and 7mm drill-bit.
Using 2 M6x14 screws and 2 M6 nuts,
secure the Load Board to the frame.
Steel shelves
Chipboard shelves