1

Fit the footplate to the frame using 2 M6x14 

screws and 2 M6 self-locking nuts

7

Once lifted, ensure the frame is secured.

13

Depending on the configuration provided, 

continue to safely secure all beams following 

the previous steps (steps 8 -11).

19

Position the steel shelves on the beams.

2

Using M6x40 bolts (for 50mm upright) or 

M6x50 (for 60mm upright) and M6 nuts, 

secure the bracing sets to the frame. 

See fig A for standard configurations.

8

Place the lowest rear beam in the slot 

following the configuration provided.

14

Using a tape measure, measure the bay 

diagonally ensuring a maximum tolerance of 

+/- 3mm. Repeat this step to ensure an even 

diagonal measurement both ways.

20

After completing the assembly, a final 

inspection of the system must be carried out 

before use.

3

The assembly of this system must be carried 

out using professional tools. 
To ensure the components are not deformed 

by over tightening, please do not exceed a 

tightening value of 4.5Nm.

9

at the first end. Raise the next frame & place 

the lowest rear beam in the corresponding 

slot following the configuration provided.

15

Using a spirit level, check each frame 

vertically ensuring a maximum tolerance of 

+/- 1mm.

21

Position the chipboard shelves on the 

beams.

4

Assemble all the frames following the 

configuration provided.

10

Secure the beam connectors using the safety 

locking pins provided. 

16

After measuring vertically, ensure the frames 

are adjusted if needed. Any adjustments 

must be made using the correct levelling 

shim for the type of footplate supplied.

22

After completing the assembly, a final 

inspection of the system must be carried out 

before use.

5

When raising the frame, ensure the lower 

part is secured to avoid accidental slipping.

11

Raise the next assembled frame & repeat 

steps 8 & 9. Place the beam in the intended 

location and secure with a safety locking pin. 

17

When fixing the frames to the floor, ensure 

the floor is drilled using a SDS concrete drill 

and SDS 8mm drill bit.

Only drill 100mm deep.

23

Load Boards must be installed in a visible, 

easily accessible position. 
Hold load board in position against the 

upright and mark through holes from rear for 

drill positions.

6

Depending on the size of the frame, it is 

possible that you may need more people to 

support when lifting. 

12

Repeat steps 8-11 to safely secure the 

second rear beam.

18

Inspect the assembly before positioning the 

shelves.
For steel shelves follow steps 19-20 & 23-24.
For chipboard shelves follow step 21 onwards.

24

Drill the load Boards using a standard drill 

and 7mm drill-bit.
Using 2 M6x14 screws and 2 M6 nuts, 

secure the Load Board to the frame.

Steel shelves

Chipboard shelves

Отзывы: