RM-100 FLOOR MOUNT MANUAL
12
ASSEMBLED UNIT INSTALLATION
With the mount, retrieval chain, and cord affixed to the mixer and the tank roof penetration complete, the
entire assembled unit is ready for installation.
1. As a
precaution against dropping the chain
, attach the last link of the long retrieval chain (G) to the top
connecting link (H) prior to lowering the CertiSafe™ unit into the tank.
2. Hold both the long retrieval chain and the power cable while lowering the unit until the mixer is posi-
tioned on properly on the tank floor.
3. Remove excess slack from the long retrieval chain (G) without adding tension by:
• Carefully removing the long retrieval chain from the top connecting link.
• Pulling up any excess chain.
• Reattaching the long retrieval chain to the top connecting link, allowing any excess chain to fall slack.
• Coil excess chain and tie with wire.
4. Attach the cable support (W) to the top connecting link (H).
5. Tighten the connecting link.
Chain slack
G
H
G
H
W
4
3
1
Back to Contents