
For Technical Support Call: 800-343-7486 Monday-Friday 7AM - 4 PM (PST)
Page 6
Instructions
–
4A873
DO NOT EXCEED MANUFACTURERS WEIGHT CAPACITY FOR ROOF
Promaster City Installation
•
Locate 6 mounting locations
shown on roof of van.
•
Install “
Top
Rail”
as shown using
M6x20mm bolts with lock
washers and flat washers.
•
Be sure to put rubber washer
between the “
Top
Rail” and the roof to e
nsure sealing.
•
Place E6000 on and around threads to seal roof. (Passenger side shown)
Front EXP
Mid EXP
Rear EXP
Front Tighten
Mid Tighten
Rear Tighten