
Step 5 NV200/City Express
Line up the “Bottom Mount Panel” with the outer holes that you removed the “D” rings from, this will tell you where the center
ones are located. Cut holes in the mat to expose the center 2 mounting holes and remove the factory hardware. Place the nylon
spacers under the “Partition Assembly” and install the 4 M8x45MM bolts. You can now tighten the top first, and then the
bottom. The installation is complete.
9