 TECHNICAL REFERENCE AND USER’S GUIDE  

REVAAA

INTERNAL PAGER SYSTEM CONTROL UNIT

3

INSTALLATION

PREPARATION

The PG100-CU internal pager system has been designed so as to be mounted on wall 

surfaces.  First  of  all,  the  location  to  install  the  device  should  be  determined.  Such  a 

location is supposed to possess the properties listed below, in order for the PG100-CU 

unit to operate in the most efficient way:   

•   The room in which the device will be installed should be clean, dust-free and the 
 

system should not be exposed to direct sunlight.  

•   The environmental temperature should be in the range 0 C°- 40 C° and the humidity 
 

should not exceed 80 %.

•   No  metal  objects  should  be  in  the  vicinity  of  the  device,  for  they  might 
 

affect antenna performance.

•   Locations  of  the  electrical  outlet  and  DTB04  if  there  is  one  should  be  taken  into 
 

consideration.

•   Locations of the PG100-RF transmitters should be taken into consideration.
•   The  box  should  be  mounted  at  a  position  so  that  the  front  cover  will  easily  be 
 

opened, which is 100-160 cm above the floor.

APPLICATION

The PG100 comes with a mounting template and two anchor plugs pairs. The “Mounting 

Template”, which is supplied together with the module, is supposed to be used in order 

to determine the location of the module and spots for the holes that are required for the 

installation.     

In order to hang the PG100 on the wall:

•   Place the mounting template on the wall surface.

•   Drill holes on the wall at two points determined through the mounting template.

•  Insert the anchor plugs into the holes.

•   Insert screws into the anchor plugs and drive them in until a 7 mm-portion of their 

 

heads remain outside the wall surface.

•   Hang the device onto those screws through the pear holes, which are on the back cover.

WIRING OF THE PG100-CU UNIT

Power Connection:

The  PG100-CU  unit  is  fed  on  -48  VDC.  The  product  DTB04  can  be  used  for  feeding. 

The connection cable to the DTB04 unit is supplied with the PG100-CU unit. The cable 

connector  is  attached  to  the  FEED  connector.  Utilization  of  the  BK38  battery  unit, 

alongside with the DTB04 unit, prevents blackouts from disrupting communication and 

makes the system remain functional for at least 10 hours.   

PG100-RF Connection:

The connections, which provides for PG100-RF transmitters both data transmission and 

voltage  feed  upon  wish  (-48  VDC),  are  made  to  the  PAGER_TX  connectors  within  the 

PG100-CU. Signal assignments for the connector have been shown in the figure below. 

The cable that extends out of this connector is supposed to be attached to the connector 

PG100-CU, which is on the product PG100-RF. Cable length should be less than 1 km for 

copper cable with diameter of 0.5 mm. In case the feed is not applied for the PG100-RF 

unit, it will be sufficient if only the RS422_POS and RS422_NEG signals of the PAGER_TX 

connector are carried over the cable connection.     

 

                         PAGER_TX connector signal assignments  

4

Figure-2: The PG100-CU unit connection layout

Содержание PG100-CU

Страница 1: ......

Страница 2: ...ule cabinet should always be kept closed Prior to hanging the module on the wall one should make sure screws are not defective Precautions must be taken in order to prevent any harmful substances from...

Страница 3: ...apter for which knowledge in mechanics electricity and electronics may be prerequisite aims to introduce structure of the device Presentation of the information in this chapter follows a path from the...

Страница 4: ...itted from the Karel exchange to the PG100 RF transmitters and provides synchronous operation of the transmitters At most four PG100 RF units can be connected to a single PG100 CU unit The PG100 CU un...

Страница 5: ...wall Place the mounting template on the wall surface Drill holes on the wall at two points determined through the mounting template Insert the anchor plugs into the holes Insert screws into the ancho...

Страница 6: ...own in the figure below Tips specified as NC indicate that no connection will be made there The tip RS422_POS and KTS_MS is common for the KTS and RS422 connection When a connection is made to a PC ov...

Страница 7: ...TECHNICAL REFERENCE AND USER S GUIDE REVAAA INTERNAL PAGER SYSTEM CONTROL UNIT 7 8...

Страница 8: ...TECHNICAL REFERENCE AND USER S GUIDE REVAAA INTERNAL PAGER SYSTEM CONTROL UNIT 9 10...

Страница 9: ...TECHNICAL REFERENCE AND USER S GUIDE REVAAA INTERNAL PAGER SYSTEM CONTROL UNIT 11 12...

Отзывы: