8
English
5.906-498.0 Rev. 00 (09/09)
1
Terminal strip X2
2
Control chip
3
Ground cable (protective conductor)
4
Neutral conductor
5
Phase
6
Power cord
7
Main switch
Disconnect the ground cable (protective conductor) on the ter-
minal strip X2.
Disconnect the phase and the neutral connector on the main
switch.
1
Turbine casing
2
Cable guide
3
Ferrit ring (anti-interference ring)
4
Clamp for mains cable
5
Power cord
6
Filter casing
7
Mains cable grommet
Remove the clamp for mains cable.
Remove the mains cable from the cable guide.
Remove the ferrit ring (anti-interference ring).
Thread the mains cable through the grommet.
Install the new mains cable in reverse sequence.
1
Electrode cable, left
2
Terminal strip X3
3
Ground cable to filter casing
4
Terminal strip X2
5
Control chip
6
Instrument panel
7
Electrode cable, right
8
Fastening screw for interference filter
9
Anti-interference filter
10 Main switch
11 Switch for filter shake off system
12 Ground cable of the suction turbine
Remove the fastening screw for the interference filter.
Remove the interference filter and disconnect it.
Replace the interference filter.
Connect the new interference filter as per the circuit diagram.
Remove the main switch or the switch for the filter shake off
system and disconnect it.
Replace the main switch or the switch for the filter shake off
system.
Connect the new main switch or the new switch for the filter
shake off system as per the circuit diagram.
5.9
Replacing the mains cable
2
5
7
1
6
4 3
1
3
5
4
7
2
6
5.10 Replace the interference filter
5.11 Replace the main switch and the switch for the
filter shake off system
5
2
10 11
1
7
4
8
12
6
3
9