23
Operations
Pre Run Setup
1. To unfold handle, loosen knob, rotate upper
steering column and steering wheel back to stop.
Tighten knob.
2. Install the vacuum shoe and brush. Fill solution
tank with water and chemical. (see Filling the
Solution Tank instructions).
3. To adjust handle to comfortable operating position,
loosen knob, slide to comfortable height and
tighten.
4. Plug cord into grounded outlet. Place the power
cord in its holder on the machine by wrapping it
through the Cord Holder and plugging it into the
pigtail of the machine.
STEP 3
STEP 2
OPERATION
STORAGE
STEP 1
FOR
STEP 4
8.645-280.0 Manual Operator Flotilla BRC 45-38