Page 1 of 10
LivingLife DIY Lean To Canopy
Assembly Instructions
Please Note:
Kappion accept no responsibility for any injury or consequential damage caused by the use of
unsuitable fixings or by the installation of the product that deviates in any way from that described
herein. Multi-purpose Canopies are designed and tested to withstand a Loading of 0.65K N/m2 which
is suitable for domestic use. If you are installing the canopy in an exposed location please call the
helpline before you commence.
Before proceeding with the assembly please ensure that the following conditions have been met
:
•
The wall is of solid construction – no flaking mortar or loose bricks (check with a registered
builder if unsure).
•
You have the correct fixings for the type of wall that you are installing the canopy onto.
(Please note, no wall fixings are included)
•
Check that you have sufficient space for the installation.
•
Due to the weight of the product and the nature of installation TWO people with appropriate
step ladders / scaffolding are required to install the Canopy.
Column Arrangement
All LivingLife canopies are
supplied with 2.5m length columns
as standard. We would recommend
in all cases that the columns are
secured using the “U” bracket to a
pre – laid concrete pad. Laid
approximately 400mm below
ground level.
If a suitable concrete base is
already present then the column
can be attached to the existing
base using the “U” brackets
provided. If securing to an existing
base bear in mind that the front of
the canopy will now be 2.5m
above ground level and so the
heights of the Wall Plate (as
shown on the table on Page 5)
should be increased by 400mm
accordingly. Alternatively the
columns can be cut to the required
length using a hacksaw.
tel: 01543 543 046 email: [email protected] web: carports-canopies.com
carports-canopies.com