25-63-50
© Orolia S.A.S.
Abbreviated Component Maintenance Manual
S1825501-01 / S1825501-02
Page 5
AUG 12/2013
Testing and Fault Isolation
TASK 25-63-50-700-801A01
1.
Testing and Fault Isolation
A.
General
For necessary tools and equipment,
.
B.
Test after CR12 replacement
(1)
Electrical test on PCB,
.
With an ohmmeter, check that the resistor is less than 10 ohms between:
(a)
R18 and pin 1 of CR12 (85),
(b)
R18 and pin 2 of CR12 (85),
(c)
R22 and pin 3 of CR12 (85),
(d)
R22 and pin 4 of CR12 (85),
(e)
the ground of PCB and pin 5, 6, 7 and 8 of CR12.
Figure 1001 / 25-63-50-991-03
Check of CR12 connections
(2)
Test of LRU (housing closed),
.
With an ohmmeter, check that the resistor is less than 10 ohms between:
(a)
J1-K (RCP ON) and J2-K (RCP ON),
(b)
J1-A (RCP TEST/RESET) and J2-A (RCP TEST/RESET),
(c)
J1-L (DONGLE GND) and J3-D (PWR GND).
R18
R22
2
3
4
8
7
6
5
CR12
Ground
To 1 & 2 of CR12
1
To R18
To 3 & 4 of CR12
To R22