Assembly Instructions
Outback
20
Lift Rail
(Right)
x1
3.5x14 Screw
x6
s1
Insert
d1 Dowels
into the edges of
Panel Y.
Attach
Lift Rail (left)
to
Panel Y
with
s1 Screws.
Attach
Lift Rail (right)
to
Panel Z
with
s1 Screws.
Z
Lift Rail
(Left)
x1
IMPORTANT:
Spray a bit of WD-40 or similar lubricant onto a paper towel and wipe the lift rail down.
This is necessary in order for the lift to function smoothly, and must be repeated annually.
Y
8x30 Dowel Pin
x6
d1
Main Cabinet Step 2: Back, Center and Side Panels